flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

News Briefs: Design firms say they need more project management training...  Jones named director of GSA's Design Excellence program... Carbon prices running out of gas in Northeast cap and trade market

News Briefs: Design firms say they need more project management training...  Jones named director of GSA's Design Excellence program... Carbon prices running out of gas in Northeast cap and trade market


August 11, 2010
This article first appeared in the 200908 issue of BD+C.

Design firms say they need more project management training. Nearly one-third (32%) of design and environmental firms report that project management training is their biggest training need, according to a survey in The Zweig HR Letter. Next in importance: marketing and business development training (19%) and leadership training (16%).Carbon prices running out of gas in Northeast cap and trade market. The price of carbon permits plummeted 8% for the Regional Greenhouse Gas Initiative (RGGI), which requires utilities in the Northeast to purchase carbon permits for each ton of carbon they emit. Lower demand for electricity as a result of the recession was the cause of the price plummet. More than 30 million permits (or allowances) had cleared at $3.23 each in a sale on June 17, 8% lower than the auction price in March.First green roof professionals certified. Green Roofs for Healthy Cities announced the first wave of accredited green roof professionals. These individuals have successfully completed a multidisciplinary exam encompassing five areas of concentration, including pre-design, design, contract management, quality assurance and support, and maintenance.Jones named director of GSA's Design Excellence program. Casey Jones, a principal at jones¦kroloff, has been named the next director of the General Services Administration's Design Excellence program, according to sources at the GSA. Jones will replace Thomas Grooms, the program's current head. As director of Design Excellence, Jones will oversee the architect selection and design process for the GSA.

Related Stories

| Jul 11, 2012

Skanska relocates its Philadelphia metro office

Construction firm’s new 19,100-sf office targets LEED Gold certification.

| Jul 9, 2012

Modular Construction Delivers Model for New York Housing in Record Time

A 65-unit supportive housing facility in Brooklyn, N.Y., was completed in record time using modular construction with six stories set in just 12 days.

| Jul 9, 2012

NELSON, Torchia announce merger

Former competitors seek competitive advantage by joining forces.

| Jul 9, 2012

Integrated Design Group completes UCSB data center

Firm uses European standard of power at USCB North Hall Research Data Center.

| Jul 9, 2012

Oakdale, Calif., Heritage Oaks Senior Apartments opens

New complex highlights senior preferences for amenities.

| Jul 3, 2012

Trimble to acquire WinEstimator

Acquisition adds estimating software solutions to Meridian Systems’ portfolio.

| Jul 3, 2012

Summit Design+Build completes Emmi Solutions HQ

The new headquarters totals 20,455 sq. ft. and features a loft-style space with exposed masonry and mechanical systems, 17-ft clear ceilings, two large rooftop skylights, and private offices with full glass partition walls.

| Jul 3, 2012

TOLK now called Dewberry

The renaming indicates a simplification in Dewberry’s corporate naming conventions.

| Jul 2, 2012

Bernards building mixed-use project in Beverly Hills

The project includes 88 luxury apartment homes atop a 14,000-sf Trader Joe’s market and a new coffee shop.

| Jul 2, 2012

San Francisco lays claim to the greenest building in North America

The 13-floor building can hold around 900 people, but consumes 60% less water and 32% less energy than most buildings of its kind.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021