flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

News Briefs: Design firms say they need more project management training...  Jones named director of GSA's Design Excellence program... Carbon prices running out of gas in Northeast cap and trade market

News Briefs: Design firms say they need more project management training...  Jones named director of GSA's Design Excellence program... Carbon prices running out of gas in Northeast cap and trade market


August 11, 2010
This article first appeared in the 200908 issue of BD+C.

Design firms say they need more project management training. Nearly one-third (32%) of design and environmental firms report that project management training is their biggest training need, according to a survey in The Zweig HR Letter. Next in importance: marketing and business development training (19%) and leadership training (16%).Carbon prices running out of gas in Northeast cap and trade market. The price of carbon permits plummeted 8% for the Regional Greenhouse Gas Initiative (RGGI), which requires utilities in the Northeast to purchase carbon permits for each ton of carbon they emit. Lower demand for electricity as a result of the recession was the cause of the price plummet. More than 30 million permits (or allowances) had cleared at $3.23 each in a sale on June 17, 8% lower than the auction price in March.First green roof professionals certified. Green Roofs for Healthy Cities announced the first wave of accredited green roof professionals. These individuals have successfully completed a multidisciplinary exam encompassing five areas of concentration, including pre-design, design, contract management, quality assurance and support, and maintenance.Jones named director of GSA's Design Excellence program. Casey Jones, a principal at jones¦kroloff, has been named the next director of the General Services Administration's Design Excellence program, according to sources at the GSA. Jones will replace Thomas Grooms, the program's current head. As director of Design Excellence, Jones will oversee the architect selection and design process for the GSA.

Related Stories

| Oct 27, 2011

iProspect selects VLK Architects for new office design

Company growth prompted iProspect to make the decision to move to a new space.

| Oct 27, 2011

ASSA Abloy, MAXXESS Systems announce U.S. Aperio integration

Aperio will integrate with MAXXESS's eAXxess  and Efusion Event Management Software packages.

| Oct 26, 2011

Metl-Span selected for re-roof project

School remained in session during the renovation and it was important to minimize the disruption as much as possible.

| Oct 26, 2011

Shawmut Design and Construction awarded Tag Heuer build in Aventura, Fla.

New store features 1,200 sf fit out at Aventura Mall.

| Oct 25, 2011

HKS Science & Technology practice formed

Specializing in the planning and design of highly technical building types, HKS’s Science & Technology practice offers the broadest range of services available to the academic and biomedical research, biotechnology, pharmaceutical and medical device community, including laboratory programming, planning and design, strategic science planning and laboratory equipment planning.

| Oct 25, 2011

Universal teams up with Earthbound Corp. to provide streamlined commercial framing solutions

The primary market for the Intact Structural Frame is light commercial buildings that are typically designed with concrete masonry walls, steel joists and steel decks.

| Oct 25, 2011

Ritner Steel CEO elected to AISC Board

Freund will begin serving on the AISC board of directors, assisting with the organization's planning and leadership in the steel construction industry.

| Oct 25, 2011

Commitment to green building practices pays off

The study, conducted by the Pacific Northwest National Laboratory, built on a good indication of the potential for increased productivity and performance pilot research completed two years ago, with similarly impressive results.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021