flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

News Briefs: GBCI begins testing for new LEED professional credentials... Architects rank durability over 'green' in product attributes... ABI falls slightly in April, but shows market improvement

News Briefs: GBCI begins testing for new LEED professional credentials... Architects rank durability over 'green' in product attributes... ABI falls slightly in April, but shows market improvement


August 11, 2010
This article first appeared in the 200906 issue of BD+C.

GBCI begins testing for new LEED professional credentials. The Green Building Certification Institute last week began testing candidates who wish to pursue credentials through the new LEED Green Associate or LEED Accredited Professional Operations and Maintenance programs. The LEED Green Associate program is intended for individuals seeking knowledge and skills in the non-technical fields of green practice. LEED AP O+M is for those seeking advanced knowledge in sustainable operations and specialized expertise in greening existing buildings.Architects rank durability over 'green' in product attributes. Architects say durability is the most important attribute for a green building product, according to a new industry survey commissioned by PPG Industries. Durability was followed by Energy Star compliance, life cycle assessment, no- or low-volatile organic compound (VOC) content, and the ability to source products regionally.Architecture Billings Index falls slightly in April, but shows market improvement. After an eight-point jump in March, the Architecture Billings Index (ABI) fell less than a full point in April. The American Institute of Architects (AIA) reported the April ABI rating was 42.8, down from the 43.7 mark in March. This was the first time since August and September 2008 that the index was above 40 for consecutive months. The new projects inquiry score, however, was positive at 56.8.ASHRAE's building energy label set to launch in June. A label for grading commercial buildings according to their energy efficiency is being developed by the American Society of Heating, Refrigeration and Air-Conditioning Engineers (ASHRAE). The label, due out in June, will measure both the design efficiency and operational performance of buildings, similar to the government's Energy Star program.AIA names bus shelter, restroom, Cleveland Arts Center among small project winners. The American Institute of Architects has selected 20 recipients of the 2009 Small Project Awards, including: the Media Arts Center in Cleveland, Ohio, by Robert Maschke Architects; the Public Bus Shelters of New Haven Conn., by David Thompson Architects; and the Lady Bird Lake Hike and Bike Trail restroom facility in Austin, Texas, by Miro Rivera Architects. See below for more on restrooms.Half of U.S. design firms cut staff, profit margins stabilize. Half of architecture, engineering, and environmental consulting firms cut staff in 2008, while profit margins on net service revenue remained virtually unchanged from 2007 to 2008, according to ZweigWhite's newly released 2009 Financial Performance Survey.DOE sets partnership with hospitals for energy efficiency. The U.S. Department of Energy has launched the Hospital Energy Alliance (HEA), an industry-led partnership between the DOE and national healthcare sector leaders to promote the integration of advanced energy efficiency and renewable technologies in hospital design, construction, retrofit, operations, and maintenance.More than 30 new Marriott hotels seek LEED certification. Marriott International recently announced that its global headquarters building in Bethesda, Md., and more than 30 of its hotels in design or development or under construction are expected to achieve LEED (Leadership in Energy and Environmental Design) certification from the U.S. Green Building Council.

Related Stories

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

| Oct 13, 2010

Modern office design accentuates skyline views

Intercontinental|Exchange, a Chicago-based financial firm, hired design/engineering firm Epstein to create a modern, new 31st-floor headquarters.

| Oct 13, 2010

Hospital and clinic join for better patient care

Designed by HGA Architects and Engineers, the two-story Owatonna (Minn.) Hospital, owned by Allina Hospitals and Clinics, connects to a newly expanded clinic owned by Mayo Health System to create a single facility for inpatient and outpatient care.

| Oct 13, 2010

Biloxi’s convention center bigger, better after Katrina

The Mississippi Coast Coliseum and Convention Center in Biloxi is once again open for business following a renovation and expansion necessitated by Hurricane Katrina.

| Oct 13, 2010

Tower commemorates Lewis & Clark’s historic expedition

The $4.8 million Lewis and Clark Confluence Tower in Hartford, Ill., commemorates explorers Meriwether Lewis and William Clark at the point where their trek to the Pacific Ocean began—the confluence of the Mississippi and Missouri Rivers.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021