flexiblefullpage
billboard
interstitial1
catfish1

Greening Data Centers

A 40-foot-high biowall helps cool the LEED Platinum Citi Data Centre…

4. What Building Teams Are Doing To Conserve Water Outside Buildings

While significant progress in water conservation has been made inside buildings—primarily with the…

3. What Building Teams Are Doing To Conserve Water Inside Buildings

While hard data on total water use in buildings is somewhat difficult to come by, the U.S.…

1. Water Performance: Getting the Most from Every Drop

Since 2003, Building Design+Construction has produced a series of annual reports on the green…

Precast All the Way

For years, precast concrete has been viewed as a mass-produced product with no personality or…

5. Certification Programs + Water Performance

Water factors into all national green building certification programs, and while it may account for…

6. The Water-Energy Nexus

Water and energy in buildings are intertwined, not only at the point of consumption, but also…

2. AEC Professionals and Home Builders Voice Their Opinions on Issues Related to Water Performance

Respondents to Building Design+Construction’s “Nonresidential Survey” expressed a wide variety…

Giants 300 Healthcare Report

Project: SSM St. Clare Health Center, Fenton, Mo.Architect, structural…

Bronze Award: John G. Shedd Aquarium, Chicago, Ill.

The use of BIM software helped the Building Team overcome tight site…

Canadian Design Firm Makes Its Mark

For a firm of its size—45-50 employees, depending on the number of interns on board at any…

Giants 300 'Business Is Good'

Hallelujah! Business was good in 2004 for many AEC firms in Building Design & Construction…

Historical Refinement

A renovation project doesn't necessarily result in a conspicuous change of appearance. A case…

Changing spaces in workplaces

Bland is banned in the office spaces of the new millennium. Whether companies are…

Stephen W. Fort, 38

+GO BACK Stephen W. Fort, 38   VP, general managerTurner Construction Company,…

Platinum Award: World-Class Revival on Utah's Capitol Hill

The 10-year, $212 million modernization project involved a complete…

Sunny Side Up

After more than a decade during which no major resorts were constructed in the Phoenix area,…

AIA Course: Building with concrete – Design and construction techniques

                 SummaryConcrete demands energy and natural resources, a careful design approach,…

A place that heals

Can buildings heal the sick? If considered a physical extension of health-care practice and an…

University Report

Higher education construction spending is currently 18% higher than a year ago, but the year-…