Quest Diagnostics has recently unveiled its new 250,000-sf laboratory facility located in Clifton, N.J. The Mark Cavagnero Associates-designed project has become the largest automated specimen testing facility in the world.
The facility incorporates automation technology at an unprecedented scale to provide more comprehensive testing offerings, quicker turnarounds, and increased capacity. The design breaks down the traditional silos between disciplines and introduces new channels for communication, bringing together clinical, laboratory, and administrative offices, which were previously housed in four different locations across the company’s campus.
The project features seamless indoor/outdoor connectivity, light-filled workstations, and large mixed-use social spaces. The central building comprises a large ground-level laboratory and laboratory support spaces. Offices and indoor/outdoor amenity spaces arranged as a linear bar are located on the second floor along the north side of the building.
A skylight-topped “communication staircase” anchors the building, providing space for cross-departmental engagement. The Oculus, a curved glass observation mezzanine, will offer staff and visitors an intimate view of lab operations without interrupting floor productivity. A high-performance glass facade reduces climate control needs and boosts energy savings while maximizing transparency and natural light. The laboratory building is joined by a five-story parking garage in an L shaped scheme that breaks down the overall scale of the site into smaller volumes and creates a welcoming entrance with an open plaza.
The project officially opened on Oct. 12.
Related Stories
Laboratories | Jun 24, 2020
CDC set to build the most advanced high containment laboratory in the country
Flad Architects, Page Southerland Page, and WSP will plan, program, and design the HCCL.
University Buildings | Jun 3, 2020
Renovation can turn older university buildings into high-performing labs
David Miller of BSALifeStructures offers technical advice on renovation of college and university laboratories and scientific research facilities.
Giants 400 | Aug 13, 2019
2019 Science + Technology Giants Report: Operational flexibility is a must for S+T buildings
The science and technology (S+T) sector is arguably the industry’s most complex because it caters to a diverse clientele with specific priorities and imperatives, according to Building Design+Construction's 2019 Giants 300 Report.
Laboratories | May 21, 2019
Georgia Tech Research Institute adds 350,000 sf of specialized tech facilities
McCarthy Building Companies with Flad Architects acted as the design-build team.
Laboratories | Apr 23, 2019
Translational health science environments: 6 strategies for open innovation and knowledge transfer
Simply putting researchers and clinicians in the same building with hopes that serendipitous collaborations will ensue will often not yield the outcomes organizations seek.
Sustainable Design and Construction | Apr 9, 2019
One of the largest zero-carbon, net-zero buildings is rising in Spokane
Catalyst will be part of an innovation hub, with Eastern Washington University as its main tenant.
Laboratories | Apr 1, 2019
The Karolinska Institute’s new laboratory building
C.F. Møller Architects designed the building.
| Mar 21, 2019
Preserving Edison's "Corporate" R&D Lab in West Orange, N.J.
Report on Thomas Edison's West Orange, N.J., Laboratory.
Mixed-Use | Oct 25, 2018
Philadelphia’s uCity Square kicks off major expansion drive
This innovation center has several office, lab, and residential buildings in the works.
University Buildings | Jul 5, 2018
Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%
KieranTimberlake designed the facility and Shawmut Design and Construction was the general contractor.