flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nine out of 10 New York City building plans fail energy code test

Nine out of 10 New York City building plans fail energy code test

Changes to the code planned for next year creating concerns


By BD+C Staff | September 10, 2014
Midtown from Brooklyn Bridge. Photo: Mark Jaroski. Licensed under Creative Commo
Midtown from Brooklyn Bridge. Photo: Mark Jaroski. Licensed under Creative Commons

Earlier this year, New York City's Department of Buildings began auditing thousands of architectural plans for new and renovated office and residential buildings. Nine of every 10 have failed to meet the energy code, a 30-year-old set of standards.

The compliance enforcement effort began under Mayor Michael Bloomberg last year, when he assigned auditors to pore over 212 randomly selected building plans. This year, auditors have examined more than 1,200 applications.

The standards are only now being enforced in earnest. In some cases, the Department of Buildings has stopped nonconforming projects. “We're very serious about this, and are trying to educate the industry on what is required,” said Gina Bocra, chief sustainability officer at the Department of Buildings, which set up a permanent audit unit this year. “Buildings are the largest source of energy consumption in our city, and how we conserve energy is key to making progress on reducing greenhouse-gas emissions.”

Some are complaining about the potential costs of compliance and potential to lengthen construction schedules. Planned additions to the building code over the next year are boosting concerns. “The energy code can be an effective way to increase efficiency if it remains flexible, but the more mandatory and prescriptive any code is, the more difficult it is to build a building that complies — particularly in New York City,” said Angela Pinsky, a senior vice president of management services and government affairs with the Real Estate Board of New York.

(http://www.businessinsurance.com/article/20140818/NEWS07/140819859?tags=|338|69|310|80|303)

Related Stories

| Aug 16, 2012

Public sector pushes sustainable building forward

Not usually noted for its innovation, the public sector has done the most to advance sustainable building, according to a recent panel of green building professionals.

| Aug 16, 2012

Canada’s first net-positive building under construction in Milton, Ontario

The GreenLife Business Centre in Milton, Ontario near Toronto is set to become the first net-positive energy building in Canada.

| Aug 9, 2012

St. Paul cannot adopt overly restrictive egress windows policy, court rules

The Minnesota state Court of Appeals rejected St. Paul's attempt to adopt a policy on egress windows that was stricter than state law.

| Aug 9, 2012

Fire chief questions building code after St. Louis apartment building fire

A blaze that destroyed a 197-unit apartment building in St. Louis, Mo., displacing 250 residents, led the city’s fire chief to question the materials used in the construction of the four-story building.

| Aug 9, 2012

Ramps have strict criteria for ADA compliance

It is important for businesses to understand that an existing ramp at a building entrance may not mean that barrier removal obligations under the Americans with Disabilities Act have been met.

| Aug 9, 2012

ClickSafety, AGC provide online training program for construction professionals

Construction professionals will be able to take a wide range of mandatory and optional safety training programs online through a new collaboration between the Associated General Contractors of America and ClickSafety.

| Aug 9, 2012

Tornado-ravaged Greensburg, Kansas’s new green buildings save $200K a year

The town of Greensburg, Kan., virtually destroyed by a tornado in 2007, decided to rebuild 13 public buildings according to green standards.

| Aug 2, 2012

FBI investigates Turner, Tishman, Skanska, and Plaza Construction for billing practices on public projects in New York

After charges filed against Bovis Lend Lease in April led to an admission of guilt and $56 million in fines for overbilling clients, federal prosecutors are investigating the billing practices of four more New York City construction firms, according to reports.

| Aug 2, 2012

Court ruling may lead to more destructive testing on unfinished Harmon Tower in Las Vegas

A Clark County, Nevada district court judge ruled that the unfinished Harmon Hotel at CityCenter, operated and half-owned by MGM Resorts, could not use extrapolation when requesting damages at a possible trial.

| Aug 2, 2012

NIBS council recommends private and public measures to improve building sustainability

A new report by the National Institute of Building Sciences Consultative Council highlights four several areas that need focus to improve sustainability in buildings and infrastructure.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021