flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | Dec 5, 2018

Canadian retailer builds net-zero stores

Other chains also boost green efforts with PVs, EV charging stations.

Codes and Standards | Dec 4, 2018

Action on building codes would spur low-carbon cities

Faster retrofit cycles, increased energy-efficiency requirements for existing buildings needed.

Codes and Standards | Nov 30, 2018

Best solution to prevent California wildfire disasters: Stop building in places likely to burn

Approach would be unpopular as people attracted to stunning wooded landscapes.

Codes and Standards | Nov 29, 2018

USGBC and BRE form partnership

Two green standards groups will collaborate on standards, platforms, and research.

Codes and Standards | Nov 29, 2018

Parking garages in N.Y. State will have to be inspected every three years

Professional engineer must assess conditions.

Codes and Standards | Nov 28, 2018

To build water-efficient cities, water managers and urban planners must coordinate better

Lack of time and resources, and practitioners not in habit of working together hamper efforts.

Codes and Standards | Nov 26, 2018

All LEED-certified buildings eligible for LEED recertification

Projects must submit 12 months of data demonstrating continued or improved performance.

Codes and Standards | Nov 20, 2018

OSHA publishes updates to crane operator certification requirements

Long-delayed rules accept certifications by type or type and capacity.

Codes and Standards | Nov 19, 2018

Guide offers understanding of elements that create successful multi-floor communal spaces

CTBUH technical document analyzes how to approach tall urban habitat.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021