flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | May 2, 2017

U.S. announces preliminary tariffs on Canadian softwood lumber

The rates range from 3% to 24% per producer.

Codes and Standards | Apr 28, 2017

New York man alleged to have posed as licensed architect faces possible prison time

He is charged with defrauding construction companies, business owners, and local governments.

Codes and Standards | Apr 27, 2017

Extensive list of plug load efficiency utility incentives available for free download

The Dept. of Energy resource is a state-by-state compilation with hundreds of listings.

Codes and Standards | Apr 26, 2017

Chicago commits to 100% renewable power for all city buildings

In doing so, it becomes largest U.S. city to make such a pledge.

Codes and Standards | Apr 25, 2017

Concerns over increased construction costs following Trump executive orders

‘Buy American’ requirement and revised H-1B visa restrictions could raise prices on supplies, labor.

Codes and Standards | Apr 24, 2017

‘Staggering delays, exorbitant costs’ in New York City library, cultural building construction

Study finds significant problems with how city manages capital projects.

Codes and Standards | Apr 20, 2017

California lawmakers have had little success in attracting sports stadiums

Only one of several attempts has had an impact in recent years.

Codes and Standards | Apr 19, 2017

Dept. of Energy releases updated versions of EnergyPlus and OpenStudio building energy modeling tools

The updated versions include full support for variable speed DX coils, enhanced plant auto-sizing, new fan model, and support for non-rectangular windows.

Codes and Standards | Apr 18, 2017

K-12 school daylighting initiative created to promote best practices

Eneref Institute creates networking group of school administrators for ideas to overcome market obstacles.

Codes and Standards | Apr 17, 2017

OSHA delays enforcing crystalline silica standard in construction industry

Enforcement will begin Sept. 23, three months later than planned. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021