flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | May 9, 2016

Safety Stand-Down yields proposals to boost construction safety

One example: Gilbane encourages safety harnesses for all working above 6 feet.  

Codes and Standards | May 9, 2016

EcoDistricts unveils sustainable neighborhood framework

Focus is on equity, resilience, and climate protection.  

School Construction | May 3, 2016

Florida clamps down on school construction spending

Critics fear rules will hamper ability to build schools with desired features.  

Resiliency | May 2, 2016

Connecticut to develop new code standards for resiliency

Expected more frequent severe weather events due to climate change prompts review.  

Contractors | Apr 29, 2016

OSHA issues advisory to protect workers from Zika virus

Construction industry workers considered at high risk.  

Codes and Standards | Apr 28, 2016

New research finds 30 measures to significantly cut energy use

ASHRAE’s prescription cuts across all building types and climates.  

Codes and Standards | Apr 27, 2016

Florida gives developers more time to install first responder radio signal systems

Expensive upgrades can be postponed for several years.  

Codes and Standards | Apr 25, 2016

San Francisco becomes first big U.S. city to require solar panels on new buildings

Pertains to commercial and residential buildings shorter than 10 stories.  

Codes and Standards | Apr 25, 2016

GSA adopts SITES land development and management rating system

Federal agency will use for properties with and without buildings.  

Wood | Apr 22, 2016

Revised 2015 Manual for Engineered Wood Construction available

American Wood Council Document offers design information for structural applications.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021