flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST issues new code requirements

NIST issues new code requirements


By By BD+C Staff | October 31, 2011

U.S. National Institute of Standards and Technology code revision recommendations in the wake of the World Trade Center terrorist attacks are being implemented in new high-rise construction, including One World Trade Center, the lead building of the new World Trade Center complex.

New requirements include:

  • Buildings taller than 420 feet are now required to include an extra exit stairwell or a specially designed elevator that occupants can use for evacuations
  • Stairwells in buildings more than 75 feet high must now have glow-in-the-dark markings that show the exit path even when lighting is out or dim
  • Spray-applied fire-resistive materials must perform four times more effectively than current requirements in buildings 75 to 420 feet tall, and more than seven times better in buildings taller than 420 feet. BD+C

Related Stories

Codes and Standards | Apr 23, 2020

Group will create ecosystem for smart building data

Seven Finnish companies aim to integrate all technical systems into a single platform.

Codes and Standards | Apr 23, 2020

COVID-19 epidemic demonstrates value of flexible hospital space

Some rooms being repurposed for ICU care.

Codes and Standards | Apr 15, 2020

Embodied carbon footprint can be reduced by using conventional materials

High-SCM concrete, and cellulose and wood fiber insulation among the greener alternatives.

Coronavirus | Apr 13, 2020

COVID-19 alert: City conducts a 'virtual building inspection' to allow Starbucks and bank to open

Bothell, Wash., issues a certificate of occupancy to developer after inspecting the property online. 

Codes and Standards | Apr 13, 2020

Design competition focuses on reducing urban heat island effect

Cool Abu Dhabi aims to transform urban life in the Middle East.

Codes and Standards | Apr 13, 2020

What building science says about reducing COVID-19 transmission

Impact of temperature and relative humidity is unclear.

Codes and Standards | Apr 9, 2020

Owners retrofitting properties, monitoring performance during epidemic

Covid-19 outbreak may lead employers to reevaluate office commitments.

Codes and Standards | Apr 7, 2020

Dept. of Labor publishes guidance on paid sick leave, expanded family and medical leave

Includes fact sheets for employees, employers, and a questions and answers document.

Codes and Standards | Apr 1, 2020

Standards and codes meetings halted, postponed

ASTM International cancels in-person standards meetings; DOE’s National Energy Codes Conference postponed.

Codes and Standards | Mar 26, 2020

Ransomware attack on Canadian contractor underscores need for cybersecurity

Victimized company Bird Construction has defense, law enforcement contracts.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021