flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NIST recommends tougher standards for tornado resilience

NIST recommends tougher standards for tornado resilience

New model building code standards are among the 16 recommendations of a report by the National Institute of Standards and Technology.


By BD+C Staff | December 11, 2013

Buildings in tornado-prone areas should be constructed to withstand strong winds just as hurricanes are factored into building codes in coastal areas, says a federal report examining the 2011 killer tornado in Joplin, Mo.

New model building code standards are among the 16 recommendations of a 492-page draft report released by the National Institute of Standards and Technology (NIST).

Except for nuclear power plants, safe rooms, and storm shelters, “there are no standards for the tornado-resistant design of ordinary buildings and infrastructure” in this country, the report said. The agency recommends the development of national standards for the design of tornado-resistant buildings, and says those standards should be made part of local building codes.

(http://www.kansascity.com/news/local/article332249/Stronger-building-codes-could-have-saved-lives-in-Joplin-tornado-federal-report-says.html)

Related Stories

| Feb 19, 2014

OSHA proposes three-year postponement of crane operator certification requirement

OSHA’s proposal to postpone the compliance date for crane operator certification by three years was made official on Feb. 7 when it was published in the Federal Register.

| Feb 19, 2014

USGBC introduces new online educational platform

The U.S. Green Building Council has introduced “Education @USGBC” a new educational platform.

| Feb 17, 2014

Channeling weather forecasts to building systems can yield significant energy savings

Using weather forecasts to predict outdoor temperature changes can lead to significant energy savings, exceeding 10%, researchers say.

| Feb 17, 2014

Lawmakers may take away control of Florida hospital project from the VA

The project is $100 million over budget and has missed its scheduled completion date.

| Feb 17, 2014

Business, labor at odds over toughening of OSHA silica dust rule

OSHA says the rules will protect workers and prevent 700 fatalities annually. Others say the rules would hurt businesses and jobs. 

| Feb 17, 2014

Tulsa, Okla., mulls code change to require storm shelters in new schools

State and city officials are pushing for increased bonding capacity to pay for the storm shelters.

| Feb 13, 2014

Appraisal Institute issues guidelines on evaluating green property

The Appraisal Institute and the Institute for Market Transformation have issued guidelines for training property appraisers to evaluate green buildings.

| Feb 7, 2014

New LEED Dynamic Plaque system will measure building performance

The U.S. Green Building Council recently unveiled the LEED Dynamic Plaque, which is a new system designed for benchmarking and comparing post-occupancy building performance on a global scale.

| Feb 7, 2014

Los Angeles officials struggle to deal with needed seismic retrofits

Sixteen years ago, the Los Angeles City Council decided against requiring retrofits of existing buildings because of the projected cost and the threat of losing 20,000 apartment buildings.

| Feb 7, 2014

Los Angeles officials struggle to deal with needed seismic retrofits

Sixteen years ago, the Los Angeles City Council decided against requiring retrofits of existing buildings because of the projected cost and the threat of losing 20,000 apartment buildings.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021