flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Nonresidential Construction Index rises in fourth quarter

Nonresidential Construction Index rises in fourth quarter

There are a number of reasons for optimism among respondents of FMI's quarterly Nonresidential Construction Index survey, including healthier backlogs and low inflation.


By FMI | November 21, 2014
Photo: Tangopaso via Wikimedia Commons
Photo: Tangopaso via Wikimedia Commons

FMI, a leading provider of management consulting and investment banking to the engineering and construction industry, announces the release of the 2014 Fourth Quarter Nonresidential Construction Index report

The NRCI shows a slight increase from 62.5 in the third quarter to 62.8 in the fourth quarter of 2014. This is nearly 5.5 points ahead of fourth quarter 2013. An NRCI greater than 50 indicates improvement or expansion.

There are many good reasons for optimism by NRCI survey respondents this quarter. The top-three are: businesses are starting to build again, backlogs are expanding, and future business looks good with low inflation. A close fourth is a sense of financial security with improved balance sheets.

However, the costs of labor and materials are still on the rise, thus holding down the overall NRCI score. In addition, nearly one-fourth of the panelists expressed concern about the availability of skilled labor.

To download a copy of the full report, click here

About FMI
FMI is a leading provider of management consulting, investment banking* and research to the engineering and construction industry. FMI services all segments of the industry providing clients with value-added business solutions. 

Related Stories

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 20, 2012

Data Centers Report: Demand ‘exploding’

BD+C's Giants 300 Top 25 AEC Firms in the Data Center sector.

| Jul 20, 2012

Office Report: Fitouts, renovations keep sector moving

BD+C's Giants 300 Top 25 AEC Firms in the Office sector.

| Jul 20, 2012

K-12 Schools Report: ‘A lot of pent-up need,’ with optimism for ’13

The Giants 300 Top 25 AEC Firms in the K-12 Schools Sector.

| Jul 20, 2012

Higher education market holding steady

But Giants 300 University AEC Firms aren’t expecting a flood of new work.

| Jul 20, 2012

3 important trends in hospital design that Healthcare Giants are watching closely

BD+C’s Giants 300 reveals top AEC firms in the healthcare sector.

| Jul 20, 2012

Global boom for hotels; for retail, not so much

The Giants 300 Top 10 Firms in the Hospitality and Retail sectors.

| Jul 20, 2012

Firms bracing for DoD cuts

The Giants 300 Top 25 AEC Firms in the Military sector.

| Jul 20, 2012

Gensler, Stantec, Turner lead ‘green’ firms

The Top 10 AEC Firms in Green Buildings and LEED Accredited Staff.

| Jul 19, 2012

Renovation resurgence cuts across sectors

Giants 300 reconstruction sector firms ‘pumping fresh blood in tired spaces.’

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021