flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

November 2011: On the Drawing Board

November 2011: On the Drawing Board

Minneapolis’s first luxury high-rise in 30 years; luxury residences in Tel Aviv; outpatient center and offices in Midlothian, Va.; reuse project in North Carolina. 


By Leslie Streicher, Associate Editor | November 10, 2011
This article first appeared in the November 2011 issue of BD+C.

OpusDowntown Minneapolis to receive first luxury high-rise apartments in 30 years
Opus Development Corp. and Elness Swenson Graham Architects have announced plans to build a new high-rise luxury apartment building in downtown Minneapolis. 

 

HotchkissWood-burning plant to heat Connecticut preparatory school
The Hotchkiss School in Lakeville, Conn., will soon be warmed by a woodchip-burning heating facility, which will replace an oil-fired boiler and significantly reduce greenhouse gas emissions.

 

GruskinMixed-use center brings architectural diversity to New Jersey university
Kean University in Union, N.J., will receive a new 102,275-sf, six-story building as a gateway marking the campus’s main entrance.

 

Tel AvivU.S. architecture firm designs luxury residential center in Tel Aviv
Named the Bavli Towers, the development will encompass six 44-story towers with a total of 880 condominiums ranging from 1,100 to 5,000 sf.

 

San DiegoSan Diego community college promotes math and science with new facility
Architects Delawie Wilkes Rodrigues Barker designed the 180,000-sf building to house four floors of classrooms, lab space, and offices for biology, chemistry, mathematics, and physical sciences departments. 

 

Lend LeaseOutpatient center and medical offices to expand Midlothian, Va., hospital
A 45,000-sf hospital outpatient center and a 57,000-sf multi-tenant medical office building are planned for the Bon Secours Watkins Centre in Midlothian, Va.

 

Comm CollegeCommunity college reuse project aims for higher efficiency in North Carolina
General contractor Hodgin Construction and Smith Sinnett Architecture will collaborate on the execution of this adaptive reuse project, which involves converting a 46,000-sf warehouse into a multi-use facility for industrial training, professional development, and continuing education.

 

Federal CenterSeattle project to turn 1940s warehouse into LEED Gold workspace for Army Corps of Engineers
The redevelopment encompasses 209,000 sf at a projected cost of $72 million. Targeting LEED Gold certification, the project will incorporate various energy-saving systems while helping revitalize the surrounding community.

 

Science center Science center to inspire innovation at Massachusetts liberal arts college
The 67,000-sf, three-story academic facility will house labs, office space, a rooftop classroom and greenhouse, a two-story atrium, and informal learning spaces for innovative education. 

Related Stories

| Apr 19, 2013

7 hip high-rise developments on the drawing board

Adrian Smith and Gordon Gill's whimsical Dancing Dragons tower in Seoul is among the compelling high-rise projects in the works across the globe.

| Jan 4, 2013

January 2013: On the Drawing Board

Fort Lauderdale performing arts center to experience upgrade and expansion; new office building in Virginia to house behavioral health services; and University of Pittsburgh planning biomed research center in Italy.

| Jan 4, 2013

December 2012: On the Drawing Board

Headquarters will house office, spaces for private education company in Massachusetts; multi-phase project will lead to new MSU Denver athletic complex; and nature preserve center seeks to protect resources, educate community.

| Jan 4, 2013

November 2012: On the Drawing Board

Foster + Partners wins competition to design 650,000-sf office tower on Manhattan’s Park Avenue; $180 million facelift under way at San Marcos High School; critical access hospital in Oregon cuts down on unnecessary space.

| Oct 4, 2012

October 2012: On the Drawing Board

Dallas mixed-use development; Vandenberg Air Force base education facility; One WTC design modifications; UNO Soccer Academy in Chicago.

| Aug 7, 2012

August 2012: On the Drawing Board

Residence Hall at University of Puget Sound; $160 million Fort Irwin Replacement Hospital; Boston residential tower; high school expansion in New York; 28-story Manhattan office tower.

| Jul 13, 2012

July 2012: On the Drawing Board

Salvation Army regional HQ; China convention center; cancer institute pavilion; campus center at North Texas.

| May 31, 2012

June 2012: On the Drawing Board

Modular Design Architecture > Reuse of L.A.’s historic Dunbar Hotel; new National Guard Bureau at Hanscom AFB; Valencia College’s collaboratory; Chicago warehouse turned winery; China Mobile’s new headquarters.

| May 3, 2012

May 2012: On the Drawing Board

Renovation planned for Minnesota mall; UMass Dartmouth bioprocessing lab; mixed-use project in Broward County, Fla.; luxury development in Jordan.

| Mar 30, 2012

April 2012: On the Drawing Board

LAUSD's first design-build project; Daytona Museum of Arts expansion; and more.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021