flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Novum Structures will pay $3 million to settle violations of ‘Buy American’ regulations

Contractors

Novum Structures will pay $3 million to settle violations of ‘Buy American’ regulations

Wisconsin design and construction firm charged with repackaging materials from foreign sources.


By Peter Fabris, Contributing Editor | January 11, 2016
Novum Structures will pay $3 million to settle violations of ‘Buy American’ regulations

Kauffman Center for the Performing Arts, Kansas City, Mo. Novum Structures worked on the project. Photo: Nightryder84/Wikimedia Commons.

Architecture and construction firm Novum Structures, based in Menomonee Falls, Wis., has agreed to pay $3 million to settle civil and criminal charges that it defrauded the federal government's "Buy American" rules for contractors.

The U.S. Department of Justice charged that Novum repackaged steel and other construction materials from foreign countries and made them appear as if it were sourced in the U.S. The firm used the materials on government projects around the country.

Federal laws require the use of American-made materials in construction projects funded with federal funds. Novum specializes in glass enclosures, atriums, canopies, and skylights. 

A Novum spokesman said there was never any concern about the quality of materials used, and that the non-compliant materials represented less than 3% of the value of the work Novum did on projects subject to the “Buy American” requirements. The case began with a whistle blower lawsuit that was unsealed this month.

Related Stories

| Jun 11, 2013

Finnish elevator technology could facilitate supertall building design

KONE Corporation has announced a new elevator technology that could make it possible for supertall buildings to reach new heights by eliminating several problems of existing elevator technology. The firm's new UltraRope hoisting system uses a rope with a carbon-fiber core and high-friction coating, rather than conventional steel rope.

| Jun 10, 2013

Lake Washington STEM school combines modular and site-built construction to meet ambitious schedule

When the Lake Washington School District outside Seattle needed a new high school built on an ambitious permitting and construction schedule of seven months, modular construction proved to be an ideal solution.

| Jun 10, 2013

Turner Construction honored by National Building Museum

Turner Construction Company announced that it has been selected as the National Building Museum’s 2013 Honor Awardee.

| Jun 7, 2013

Must see: Building façade made of massive concrete drain pipes

Looking to create a unique atmosphere using natural materials for the Prahran Hotel pub near Melbourne, local architect Techné Architects cleverly incorporated a series of concrete sewer pipes into the building's main façade.

| Jun 7, 2013

40 Under 40 retrospective: Where are they now?

Every month we’ll be catching up with past 40 Under 40 honorees to see what they’ve been up to since winning the award. This month we focus on a construction manager and a healthcare designer.

| Jun 7, 2013

First look: University of Utah's ‘teaching hospital for law’

The University of Utah broke ground on its cutting-edge College of Law building, which will facilitate new approaches to legal education based on more hands-on learning and skills training.

| Jun 7, 2013

First look: Austin breaks ground on 'light-filled' Central Library

The design scheme by Lake|Flato and Shepley Bulfinch incorporates reading "porches" and a light-filled, six-story atrium.

| Jun 5, 2013

USGBC: Free LEED certification for projects in new markets

In an effort to accelerate sustainable development around the world, the U.S. Green Building Council is offering free LEED certification to the first projects to certify in the 112 countries where LEED has yet to take root.

| Jun 4, 2013

SOM research project examines viability of timber-framed skyscraper

In a report released today, Skidmore, Owings & Merrill discussed the results of the Timber Tower Research Project: an examination of whether a viable 400-ft, 42-story building could be created with timber framing. The structural type could reduce the carbon footprint of tall buildings by up to 75%.

| Jun 4, 2013

Notification reinvented: SimplexGrinnell introduces revolutionary family of intelligent notification appliances

Simplex TrueAlert ES uses addressable technology to improve protection, simplify installation and reduce operating costs.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021