flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

NSF International qualifies first wallcoverings distributor to the New American National Standard for Sustainable Wallcoverings

NSF International qualifies first wallcoverings distributor to the New American National Standard for Sustainable Wallcoverings

TRI-KES demonstrates leadership in environmental stewardship as the first distributor to earn qualification.


By By BD+C Staff | December 7, 2011
NSF International Sustainable Wallcoverings standard ANSI
NSF International developed the standard for Sustainable Wallcoverings to help architects, designers, retailers and consumers id

NSF International, an independent global organization that writes public health standards and certifies products for food, water and consumer goods, has qualified the first wallcoverings distributor to the American National Standard for Sustainable Wallcoverings – NSF/ANSI 342.

NSF International developed the standard for Sustainable Wallcoverings to help architects, designers, retailers and consumers identify sustainable and environmentally preferable wallcoverings.

NSF/ANSI 342: Sustainability Assessment for Wallcovering Products recognizes the important role distributors play in maintaining the sustainability of wallcovering products throughout their life cycle. In order to qualify and distribute certified sustainable wallcoverings, distributors must demonstrate that they follow environmentally preferable practices. This includes a comprehensive and independent NSF assessment that evaluates the environmental and social impacts of their operations.

TRI-KES, a Dallas-based sustainable commercial interior finishes distributor, is the first distributor to earn qualification under the Sustainable Wallcoverings standard. TRI-KES is qualified at the highest level and may now distribute all levels of certified wallcoverings, including Platinum.

The standard employs an easy-to-use point system to evaluate wallcovering products against performance criteria across the entire product life cycle and quantifiable metrics. Products covered by the standard include textiles, vinyl, vinyl coated, alternative polymer, alternative polymer coated, paper and other natural fiber products. NSF Certification is based on point totals from both the manufacturer and distributor to achieve a Conformant, Silver, Gold or Platinum level. BD+C

Related Stories

Giants 400 | Aug 5, 2015

ENGINEERING GIANTS: Profits, revenue on the rise at U.S. engineering firms as economy sputters back to life

The vast majority of engineering firms are decidedly bullish on revenue growth for 2015, and profitability is nearing a six-year high, according to BD+C's 2015 Giants 300 report.  

Giants 400 | Aug 4, 2015

GIANTS 300 REPORT: Top 64 Architecture/Engineering Firms

Stantec, HOK, and Callison RTKL top Building Design+Construction's 2015 ranking of the largest architecture/engineering firms in the United States. 

Giants 400 | Aug 4, 2015

GIANTS 300 REPORT: Top 106 Architecture Firms

Gensler, Perkins+Will, and Kohn Pedersen Fox top Building Design+Construction's 2015 ranking of the largest architecture firms in the United States. 

Giants 400 | Aug 4, 2015

ARCHITECTURE GIANTS: 21 practice management innovations from architecture Giants

Design firms have gone all out with management innovations in the last year. Check out which ones might work for your firm.

Architects | Aug 4, 2015

Frank Lloyd Wright School of Architecture closer to independent incorporation

The school is halfway to its first fundraising milestone, but is facing a major deadline at end of this month.

Industrial Facilities | Aug 3, 2015

Architect Jacques Rougerie envisions floating city to function as roving laboratory

The manta ray-shaped vessel will be completely self-sustaining, run on marine energy, and produce no waste. 

Cultural Facilities | Aug 3, 2015

Funding needed for Washington's Desert Storm memorial

 The National Desert Storm Memorial Foundation has a $25 million goal for the project.

Sports and Recreational Facilities | Jul 31, 2015

Zaha Hadid responds to Tokyo Olympic Stadium controversy

“Our warning was not heeded that selecting contractors too early in a heated construction market and without sufficient competition would lead to an overly high estimate of the cost of construction,” said Zaha Hadid in a statement.

Architects | Jul 30, 2015

The Lego Architect: Book offers simple how-to steps for recreating iconic buildings with Legos

The book features famous buildings accompanied with a photograph and drawing of the Lego model of the building, and a list of all the Lego pieces needed to complete a model of the building.  

Transit Facilities | Jul 30, 2015

Snøhetta designs ring-shaped cable car station in Italian Alps

In Snøhetta’s design, two cylindrical rings embedded into the existing topography, each at different elevations, will be connected by a cable car. During the minute-long cable car journey, passengers can enjoy views of the city and of the Italian Alps.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021