flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

By the Numbers

By the Numbers

66 skyscrapers to built in China over six years; 1,000 questions in the Modern Architecture game; 21,000 new jobs. 


By By Tim Gregorski, Senior Editor | March 2, 2012
1,000 - Approximate number of questions in the Modern Architecture game by NEXT
1,000 - Approximate number of questions in the Modern Architecture game by NEXT Architects, Amsterdam. The goal is simple: reach
This article first appeared in the March 2012 issue of BD+C.

66
The total number of skyscrapers China is expected to add in the next six years, DOUBLING ITS COLLECTION FROM 75 TO 141. India, the world’s second most populous nation, currently has two skyscrapers but will ADD 14 MORE IN THE NEXT FIVE YEARS.

1.4 billion
An Irish artist built an apartment made of bricks that include the SHREDDED REMAINS OF €1.4 BILLION he borrowed from Ireland’s national mint. Frank Buckley built the apartment in the lobby of a Dublin office building, which has remained vacant since its completion four years ago. “People were pouring billions into buildings now worth nothing,” says Buckley. “I WANTED TO CREATE SOMETHING FROM NOTHING.”

3,654
In feet, the proposed height of a NEW BUSINESS TOWER ON THE KHAZAR ISLANDS, a chain of 41 artificial islands in the Caspian Sea that also will include hotels and apartment buildings. The tower would be 27% TALLER than the current skyscraper champ, the BURJ KHALIFA IN DUBAI. Construction on the islands is set to begin at the end of 2013.

21,000
Number of NEW CONSTRUCTION JOBS created in January 2012, according to the Labor Department.

12
In years, the PEAK-TO-PEAK RECOVERY period for the cement industry. BY 2017, CEMENT CONSUMPTION IS EXPECTED TO REACH LEVELS LAST RECORDED IN 2005, according to the Portland Cement Association. A number of factors, including a reduction in office vacancy rates and high unemployment, contribute to the lengthy recovery period. 

5
Total number of TEMPORARY LOADING BAYS being constructed at ONE WORLD TRADE CENTER. The Port Authority of New York and New Jersey revealed that the loading dock under the trade center will not be accessible for tenants to move their equipment into the 104-story tower when it opens. A TEMPORARY TRAIN STATION for the Port Authority is blocking access to the underground loading area.

0
Amount being charged by FRANK GEHRY for his work on the Culver City, Calif., home for the Jazz Bakery. Plans call for a two-story building with the main 250-seat concert room upstairs and a small black-box theater on the ground floor. THE FOOTPRINT OF THE BUILDING MEASURES ONE-SEVENTH OF AN ACRE.

1.3
In trillions, the GLOBAL REVENUE predicted from the CONSTRUCTION OF ZERO-ENERGY BUILDINGS over the next 23 years. The figure will reach almost $690 MILLION BY 2020 and $1.3 TRILLION BY 2035, according to a report published by Pike Research.

2,000
Total number of PV panels to be installed on the FIRST NET-ZERO SCHOOL in the northeast U.S. Located in the Rossville neighborhood in Staten Island, N.Y., PS 62 is slated to cost between $55-58 million, and will open in September 2015.

35
Current percentage of CONTRACTORS THAT ARE CURRENTLY USING BIM, up 8% from 2011, according the 2012 Construction Industry Hiring and Business Outlook conducted by the Associated General Contractors. 47% of survey respondents expect BIM usage to increase in 2012, depending on the market segment. +

Related Stories

Multifamily Housing | Apr 12, 2024

Habitat starts leasing Cassidy on Canal, a new luxury rental high-rise in Chicago

New 33-story Class A rental tower, designed by SCB, will offer 343 rental units. 

Student Housing | Apr 12, 2024

Construction begins on Auburn University’s new first-year residence hall

The new first-year residence hall along Auburn University's Haley Concourse.

K-12 Schools | Apr 11, 2024

Eric Dinges named CEO of PBK

Eric Dinges named CEO of PBK Architects, Houston.

Construction Costs | Apr 11, 2024

Construction materials prices increase 0.4% in March 2024

Construction input prices increased 0.4% in March compared to the previous month, according to an Associated Builders and Contractors analysis of the U.S. Bureau of Labor Statistics’ Producer Price Index data released today. Nonresidential construction input prices also increased 0.4% for the month.

Healthcare Facilities | Apr 11, 2024

The just cause in behavioral health design: Make it right

NAC Architecture shares strategies for approaching behavioral health design collaboratively and thoughtfully, rather than simply applying a set of blanket rules.

K-12 Schools | Apr 10, 2024

A San Antonio school will provide early childhood education to a traditionally under-resourced region

In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.

University Buildings | Apr 10, 2024

Columbia University to begin construction on New York City’s first all-electric academic research building

Columbia University will soon begin construction on New York City’s first all-electric academic research building. Designed by Kohn Pedersen Fox (KPF), the 80,700-sf building for the university’s Vagelos College of Physicians and Surgeons will provide eight floors of biomedical research and lab facilities as well as symposium and community engagement spaces. 

K-12 Schools | Apr 10, 2024

Surprise, surprise: Students excel in modernized K-12 school buildings

Too many of the nation’s school districts are having to make it work with less-than-ideal educational facilities. But at what cost to student performance and staff satisfaction? 

Industrial Facilities | Apr 9, 2024

Confessions of a cold storage architect

Designing energy-efficient cold storage facilities that keep food safe and look beautiful takes special knowledge.

Cultural Facilities | Apr 8, 2024

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021