66
The total number of skyscrapers China is expected to add in the next six years, DOUBLING ITS COLLECTION FROM 75 TO 141. India, the world’s second most populous nation, currently has two skyscrapers but will ADD 14 MORE IN THE NEXT FIVE YEARS.
1.4 billion
An Irish artist built an apartment made of bricks that include the SHREDDED REMAINS OF €1.4 BILLION he borrowed from Ireland’s national mint. Frank Buckley built the apartment in the lobby of a Dublin office building, which has remained vacant since its completion four years ago. “People were pouring billions into buildings now worth nothing,” says Buckley. “I WANTED TO CREATE SOMETHING FROM NOTHING.”
3,654
In feet, the proposed height of a NEW BUSINESS TOWER ON THE KHAZAR ISLANDS, a chain of 41 artificial islands in the Caspian Sea that also will include hotels and apartment buildings. The tower would be 27% TALLER than the current skyscraper champ, the BURJ KHALIFA IN DUBAI. Construction on the islands is set to begin at the end of 2013.
21,000
Number of NEW CONSTRUCTION JOBS created in January 2012, according to the Labor Department.
12
In years, the PEAK-TO-PEAK RECOVERY period for the cement industry. BY 2017, CEMENT CONSUMPTION IS EXPECTED TO REACH LEVELS LAST RECORDED IN 2005, according to the Portland Cement Association. A number of factors, including a reduction in office vacancy rates and high unemployment, contribute to the lengthy recovery period.
5
Total number of TEMPORARY LOADING BAYS being constructed at ONE WORLD TRADE CENTER. The Port Authority of New York and New Jersey revealed that the loading dock under the trade center will not be accessible for tenants to move their equipment into the 104-story tower when it opens. A TEMPORARY TRAIN STATION for the Port Authority is blocking access to the underground loading area.
0
Amount being charged by FRANK GEHRY for his work on the Culver City, Calif., home for the Jazz Bakery. Plans call for a two-story building with the main 250-seat concert room upstairs and a small black-box theater on the ground floor. THE FOOTPRINT OF THE BUILDING MEASURES ONE-SEVENTH OF AN ACRE.
1.3
In trillions, the GLOBAL REVENUE predicted from the CONSTRUCTION OF ZERO-ENERGY BUILDINGS over the next 23 years. The figure will reach almost $690 MILLION BY 2020 and $1.3 TRILLION BY 2035, according to a report published by Pike Research.
2,000
Total number of PV panels to be installed on the FIRST NET-ZERO SCHOOL in the northeast U.S. Located in the Rossville neighborhood in Staten Island, N.Y., PS 62 is slated to cost between $55-58 million, and will open in September 2015.
35
Current percentage of CONTRACTORS THAT ARE CURRENTLY USING BIM, up 8% from 2011, according the 2012 Construction Industry Hiring and Business Outlook conducted by the Associated General Contractors. 47% of survey respondents expect BIM usage to increase in 2012, depending on the market segment. +
Related Stories
Codes and Standards | Mar 15, 2024
Technical brief addresses the impact of construction-generated moisture on commercial roofing systems
A new technical brief from SPRI, the trade association representing the manufacturers of single-ply roofing systems and related component materials, addresses construction-generated moisture and its impact on commercial roofing systems.
Sports and Recreational Facilities | Mar 14, 2024
First-of-its-kind sports and rehabilitation clinic combines training gym and healing spa
Parker Performance Institute in Frisco, Texas, is billed as a first-of-its-kind sports and rehabilitation clinic where students, specialized clinicians, and chiropractic professionals apply neuroscience to physical rehabilitation.
Market Data | Mar 14, 2024
Download BD+C's March 2024 Market Intelligence Report
U.S. construction spending on buildings-related work rose 1.4% in January, but project teams continue to face headwinds related to inflation, interest rates, and supply chain issues, according to Building Design+Construction's March 2024 Market Intelligence Report (free PDF download).
Apartments | Mar 13, 2024
A landscaped canyon runs through this luxury apartment development in Denver
Set to open in April, One River North is a 16-story, 187-unit luxury apartment building with private, open-air terraces located in Denver’s RiNo arts district. Biophilic design plays a central role throughout the building, allowing residents to connect with nature and providing a distinctive living experience.
Sustainability | Mar 13, 2024
Trends to watch shaping the future of ESG
Gensler’s Climate Action & Sustainability Services Leaders Anthony Brower, Juliette Morgan, and Kirsten Ritchie discuss trends shaping the future of environmental, social, and governance (ESG).
Affordable Housing | Mar 12, 2024
An all-electric affordable housing project in Southern California offers 48 apartments plus community spaces
In Santa Monica, Calif., Brunson Terrace is an all-electric, 100% affordable housing project that’s over eight times more energy efficient than similar buildings, according to architect Brooks + Scarpa. Located across the street from Santa Monica College, the net zero building has been certified LEED Platinum.
Museums | Mar 11, 2024
Nebraska’s Joslyn Art Museum to reopen this summer with new Snøhetta-designed pavilion
In Omaha, Neb., the Joslyn Art Museum, which displays art from ancient times to the present, has announced it will reopen on September 10, following the completion of its new 42,000-sf Rhonda & Howard Hawks Pavilion. Designed in collaboration with Snøhetta and Alley Poyner Macchietto Architecture, the Hawks Pavilion is part of a museum overhaul that will expand the gallery space by more than 40%.
Affordable Housing | Mar 11, 2024
Los Angeles’s streamlined approval policies leading to boom in affordable housing plans
Since December 2022, Los Angeles’s planning department has received plans for more than 13,770 affordable units. The number of units put in the approval pipeline in roughly one year is just below the total number of affordable units approved in Los Angeles in 2020, 2021, and 2022 combined.
BIM and Information Technology | Mar 11, 2024
BIM at LOD400: Why Level of Development 400 matters for design and virtual construction
As construction projects grow more complex, producing a building information model at Level of Development 400 (LOD400) can accelerate schedules, increase savings, and reduce risk, writes Stephen E. Blumenbaum, PE, SE, Walter P Moore's Director of Construction Engineering.
AEC Tech | Mar 9, 2024
9 steps for implementing digital transformation in your AEC business
Regardless of a businesses size and type, digital solutions like workflow automation software, AI-based analytics, and integrations can significantly enhance efficiency, productivity, and competitiveness.