flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

By the Numbers

By the Numbers

66 skyscrapers to built in China over six years; 1,000 questions in the Modern Architecture game; 21,000 new jobs. 


By By Tim Gregorski, Senior Editor | March 2, 2012
1,000 - Approximate number of questions in the Modern Architecture game by NEXT
1,000 - Approximate number of questions in the Modern Architecture game by NEXT Architects, Amsterdam. The goal is simple: reach
This article first appeared in the March 2012 issue of BD+C.

66
The total number of skyscrapers China is expected to add in the next six years, DOUBLING ITS COLLECTION FROM 75 TO 141. India, the world’s second most populous nation, currently has two skyscrapers but will ADD 14 MORE IN THE NEXT FIVE YEARS.

1.4 billion
An Irish artist built an apartment made of bricks that include the SHREDDED REMAINS OF €1.4 BILLION he borrowed from Ireland’s national mint. Frank Buckley built the apartment in the lobby of a Dublin office building, which has remained vacant since its completion four years ago. “People were pouring billions into buildings now worth nothing,” says Buckley. “I WANTED TO CREATE SOMETHING FROM NOTHING.”

3,654
In feet, the proposed height of a NEW BUSINESS TOWER ON THE KHAZAR ISLANDS, a chain of 41 artificial islands in the Caspian Sea that also will include hotels and apartment buildings. The tower would be 27% TALLER than the current skyscraper champ, the BURJ KHALIFA IN DUBAI. Construction on the islands is set to begin at the end of 2013.

21,000
Number of NEW CONSTRUCTION JOBS created in January 2012, according to the Labor Department.

12
In years, the PEAK-TO-PEAK RECOVERY period for the cement industry. BY 2017, CEMENT CONSUMPTION IS EXPECTED TO REACH LEVELS LAST RECORDED IN 2005, according to the Portland Cement Association. A number of factors, including a reduction in office vacancy rates and high unemployment, contribute to the lengthy recovery period. 

5
Total number of TEMPORARY LOADING BAYS being constructed at ONE WORLD TRADE CENTER. The Port Authority of New York and New Jersey revealed that the loading dock under the trade center will not be accessible for tenants to move their equipment into the 104-story tower when it opens. A TEMPORARY TRAIN STATION for the Port Authority is blocking access to the underground loading area.

0
Amount being charged by FRANK GEHRY for his work on the Culver City, Calif., home for the Jazz Bakery. Plans call for a two-story building with the main 250-seat concert room upstairs and a small black-box theater on the ground floor. THE FOOTPRINT OF THE BUILDING MEASURES ONE-SEVENTH OF AN ACRE.

1.3
In trillions, the GLOBAL REVENUE predicted from the CONSTRUCTION OF ZERO-ENERGY BUILDINGS over the next 23 years. The figure will reach almost $690 MILLION BY 2020 and $1.3 TRILLION BY 2035, according to a report published by Pike Research.

2,000
Total number of PV panels to be installed on the FIRST NET-ZERO SCHOOL in the northeast U.S. Located in the Rossville neighborhood in Staten Island, N.Y., PS 62 is slated to cost between $55-58 million, and will open in September 2015.

35
Current percentage of CONTRACTORS THAT ARE CURRENTLY USING BIM, up 8% from 2011, according the 2012 Construction Industry Hiring and Business Outlook conducted by the Associated General Contractors. 47% of survey respondents expect BIM usage to increase in 2012, depending on the market segment. +

Related Stories

| Aug 11, 2010

Florida mixed-use complex includes retail, residential

The $325 million Atlantic Plaza II lifestyle center will be built on 8.5 acres in Delray Beach, Fla. Designed by Vander Ploeg & Associates, Boca Raton, the complex will include six buildings ranging from three to five stories and have 182,000 sf of restaurant and retail space. An additional 106,000 sf of Class A office space and a residential component including 197 apartments, townhouses, ...

| Aug 11, 2010

Restoration gives new life to New Formalism icon

The $30 million upgrade, restoration, and expansion of the Mark Taper Forum in Los Angeles was completed by the team of Rios Clementi Hale Studios (architect), Harley Ellis Devereaux (executive architect/MEP), KPFF (structural engineer), and Taisei Construction (GC). Work on the Welton Becket-designed 1967 complex included an overhaul of the auditorium, lighting, and acoustics.

| Aug 11, 2010

Best AEC Firms to Work For

2006 FreemanWhite Hnedak Bobo Group McCarthy Building Companies, Inc. Shawmut Design and Construction Walter P Moore 2007 Anshen+Allen Arup Bovis Lend Lease Cannon Design Jones Lang LaSalle Perkins+Will SmithGroup SSOE, Inc. Timothy Haahs & Associates, Inc. 2008 Gilbane Building Co. HDR KJWW Engineering Consultants Lord, Aeck & Sargent Mark G.

| Aug 11, 2010

High-Performance Workplaces

Building Teams around the world are finding that the workplace is changing radically, leading owners and tenants to reinvent corporate office buildings to compete more effectively on a global scale. The good news is that this means more renovation and reconstruction work at a time when new construction has stalled to a dribble.

| Aug 11, 2010

Great Solutions: Business Management

22. Commercial Properties Repositioned for University USE Tocci Building Companies is finding success in repositioning commercial properties for university use, and it expects the trend to continue. The firm's Capital Cove project in Providence, R.I., for instance, was originally designed by Elkus Manfredi (with design continued by HDS Architects) to be a mixed-use complex with private, market-...

| Aug 11, 2010

Nurturing the Community

The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.

| Aug 11, 2010

AIA Course: Historic Masonry — Restoration and Renovation

Historic restoration and preservation efforts are accelerating throughout the U.S., thanks in part to available tax credits, awards programs, and green building trends. While these projects entail many different building components and systems, façade restoration—as the public face of these older structures—is a key focus. Earn 1.0 AIA learning unit by taking this free course from Building Design+Construction.

| Aug 11, 2010

BIM adoption tops 80% among the nation's largest AEC firms, according to BD+C's Giants 300 survey

The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and near...

| Aug 11, 2010

World's tallest all-wood residential structure opens in London

At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one of the tallest all-wood buildings on the planet. The tower’s structural system consists of cross-laminated timber (CLT) panels pieced together to form load-bearing walls and floors. Even the elevator and stair shafts are constructed of prefabricated CLT.

| Aug 11, 2010

Integrated Project Delivery builds a brave, new BIM world

Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021