171,271
Total of LEED ACCREDITED PROFESSIONALS recognized by the U.S. Green Building Council, as of September 2011.
LEED APs with specialty – 64,060
LEED APs without specialty – 83,985
LEED Green Associates – 23,226
Total LEED Professionals – 171, 271
Source: USGBC
$200.21
The cost per square foot to build a DAYCARE CENTER in San Francisco in 2011, according to RSMeans.
Source: RSMeans
1.0
The approximate U-FACTOR (Btu/hr-sf-°F) of currently available aluminum frame windows and doorframes. Also the number of AIA/CES DISCOVERY LEARNING UNITS that can be obtained by studying “High- Performance Windows + Doors” and passing the 10-question exam (80% score required). Source: BD+C
72%
The percentage a GEOTHERMAL HEAT PUMP can reduce energy consumption when compared to conventional HVAC system, according to the EPA. Additionally, the U.S. Department of Energy reported that geothermal heat pumps can but HVAC energy demand by 50% and overall energy demand by 35%. Geothermal heat pumps are expected to gain market share as recent government mandates require newly constructed buildings to be zero net energy. Energy-efficient retrofits will also increase market demand for the pumps. Source: EPA
46.9
The September 2011 AIA ARCHITECTURE BILLINGS INDEX, following a score of 51.4 in August 2011. The monthly ABI index scores are based on a score of 50, with scores above 50 indicating an aggregate increase in billings and scores below 50 indicating a decline. In regard to September’s 46.9 score, “It appears the positive conditions seen last month were more of an aberration,” said AIA Chief Economist Kermit Baker, PhD, Hon. AIA. Source: AIA
420
Buildings taller than 420 feet are now required to include an EXTRA EXIT STAIRWELL OR ELEVATOR that occupants can use for evacuations, according to the National Institute of Standards and Technology. Source: NIST
$886.2
Total put-in-place CONSTRUCTION DOLLARS in billions predicted for 2012, according to the latest FMI forecast, which calls for 2% growth in 2011, and 6% for 2012. In 2012, the construction industry will return a level of construction in current dollars that is comparable to levels recorded in 2003. Source: FMI
83%
The percentage of AIR REDUCTION possible following the installation of an air barrier system in a commercial or industrial building, according to the National Institute of Standards and Technology. The installation of an air barrier can also shrink gas bills by more than 40%, and reduce electrical use by 25%. Source: NIST
$65,000,000
Total funds currently invested in the energy-efficiency financing initiative known as the BILLION DOLLAR GREEN CHALLENGE. The fund aims to get colleges, universities, and other nonprofits to invest $1 billion in self-managed funds to be used to finance energy-efficiency upgrades. Source: BD+C
50,000
Owners of every New York City commercial and residential buildings larger than 50,000 sf will have to post each building’s ENERGY USE ONLINE, starting with commercial buildings in 2012, followed by residential buildings in 2013. Architects and environmentalists believe the measure will prompt owners to invest in cleaner, more sustainable designs. Source: BD+C
6
The number of sides to the Octagon House in Washington D.C., the original home of the AIA. Built between 1978 and 1800, the Octagon House was designed by Dr. William Thornton, the architect of the U.S. Capitol. Adapted to an irregular-shaped lot, the design of the three-story brick house combines a circle, two rectangles, and a triangle, resulting in a six-sided structure. Source: National Park Service
--
Submit your “By the Numbers” item to: Tim Gregorski, Senior Editor, tgregorski@sgcmail.com.
You must include documentation showing the source of your entry. Readers whose items are chosen will receive credit in the magazine and a $10 Amazon gift certificate. Decision of the editors of BD+C is final.
Related Stories
| Aug 11, 2010
Florida mixed-use complex includes retail, residential
The $325 million Atlantic Plaza II lifestyle center will be built on 8.5 acres in Delray Beach, Fla. Designed by Vander Ploeg & Associates, Boca Raton, the complex will include six buildings ranging from three to five stories and have 182,000 sf of restaurant and retail space. An additional 106,000 sf of Class A office space and a residential component including 197 apartments, townhouses, ...
| Aug 11, 2010
Restoration gives new life to New Formalism icon
The $30 million upgrade, restoration, and expansion of the Mark Taper Forum in Los Angeles was completed by the team of Rios Clementi Hale Studios (architect), Harley Ellis Devereaux (executive architect/MEP), KPFF (structural engineer), and Taisei Construction (GC). Work on the Welton Becket-designed 1967 complex included an overhaul of the auditorium, lighting, and acoustics.
| Aug 11, 2010
Best AEC Firms to Work For
2006 FreemanWhite Hnedak Bobo Group McCarthy Building Companies, Inc. Shawmut Design and Construction Walter P Moore 2007 Anshen+Allen Arup Bovis Lend Lease Cannon Design Jones Lang LaSalle Perkins+Will SmithGroup SSOE, Inc. Timothy Haahs & Associates, Inc. 2008 Gilbane Building Co. HDR KJWW Engineering Consultants Lord, Aeck & Sargent Mark G.
| Aug 11, 2010
High-Performance Workplaces
Building Teams around the world are finding that the workplace is changing radically, leading owners and tenants to reinvent corporate office buildings to compete more effectively on a global scale. The good news is that this means more renovation and reconstruction work at a time when new construction has stalled to a dribble.
| Aug 11, 2010
Great Solutions: Business Management
22. Commercial Properties Repositioned for University USE Tocci Building Companies is finding success in repositioning commercial properties for university use, and it expects the trend to continue. The firm's Capital Cove project in Providence, R.I., for instance, was originally designed by Elkus Manfredi (with design continued by HDS Architects) to be a mixed-use complex with private, market-...
| Aug 11, 2010
Nurturing the Community
The best seat in the house at the new Seahawks Stadium in Seattle isn't on the 50-yard line. It's in the southeast corner, at the very top of the upper bowl. "From there you have a corner-to-corner view of the field and an inspiring grasp of the surrounding city," says Kelly Kerns, project leader with architect/engineer Ellerbe Becket, Kansas City, Mo.
| Aug 11, 2010
AIA Course: Historic Masonry — Restoration and Renovation
Historic restoration and preservation efforts are accelerating throughout the U.S., thanks in part to available tax credits, awards programs, and green building trends. While these projects entail many different building components and systems, façade restoration—as the public face of these older structures—is a key focus. Earn 1.0 AIA learning unit by taking this free course from Building Design+Construction.
| Aug 11, 2010
BIM adoption tops 80% among the nation's largest AEC firms, according to BD+C's Giants 300 survey
The nation's largest architecture, engineering, and construction companies are on the BIM bandwagon in a big way, according to Building Design+Construction's premier Top 50 BIM Adopters ranking, published as part of the 2009 Giants 300 survey. Of the 320 AEC firms that participated in Giants survey, 83% report having at least one BIM seat license in house, half have more than 30 seats, and near...
| Aug 11, 2010
World's tallest all-wood residential structure opens in London
At nine stories, the Stadthaus apartment complex in East London is the world’s tallest residential structure constructed entirely in timber and one of the tallest all-wood buildings on the planet. The tower’s structural system consists of cross-laminated timber (CLT) panels pieced together to form load-bearing walls and floors. Even the elevator and stair shafts are constructed of prefabricated CLT.
| Aug 11, 2010
Integrated Project Delivery builds a brave, new BIM world
Three-dimensional information, such as that provided by building information modeling, allows all members of the Building Team to visualize the many components of a project and how they work together. BIM and other 3D tools convey the idea and intent of the designer to the entire Building Team and lay the groundwork for integrated project delivery.