N|V|5 Global, one of the fastest-growing engineering and consulting firms in the industry, has proposed a public offering of 1.27 million shares of its common stock at a price of $79 per share. The company, based in Hollywood, Fla., expects this sale to net an estimated $93.5 million.
BofA Merrill Lynch and Roth Capital Partners are managing the offering, the proceeds from which N|V|5 intends to use for “general corporate purposes” that could include more acquisitions.
Since 2010, N|V|5 Global has acquired more than 25 companies. It transacted its latest purchase last September, when it acquired Marron and Associates, an environmental services firm based in New Mexico with 15 full-time professionals.
N|V|5 focuses primarily on five business verticals: construction quality assurance, infrastructure engineering and support services, energy, program management, and environmental solutions. The Company operates out more than 100 locations nationwide and abroad in Macau, Hong Kong, and Vietnam.
On Wednesday, the company’s stock price hit $90.25 per share, pushing it market capitalization briefly above $1 billion. (Its stock price closed yesterday at $83 per share.)
For the six months ended June 30, N|V|5 reported total revenue of $198.6 million, a 34.3% increase over the same period in 2017. Its net income for this period, $11.9 million, was up more than 80%.
The stock offering is scheduled to close on Monday, after which N|V|5 would still be controlled by insiders,. The company’s Prospectus states that there would be 12,399,000 shares of common stock outstanding after the offering. As of August 3, there were 732 holders of record of N|V|5’s common stock, excluding beneficial owners.
The Prospectus states that the Wright Family Trust has offered an additional 190,500 of its 921,717 shares that underwriters can purchase if they choose to exercise their options within the next 30 days. Dickerson Wright, PE, has been N|V|5’s Chairman and CEO since the company’s inception in 2009.
Related Stories
| Apr 25, 2014
How the 'digital natives' will transform your Building Team
The newest generation to enter the workforce is like no other that has come before it. This cohort is the first to grow up with the Internet, mobile technologies, and an “always connected” lifestyle.
| Apr 25, 2014
A radiant barrier FAQ: Everything you wanted to know but were afraid to ask
There are many examples of materials developed for the space program making their way into everyday life and radiant barriers are just that. SPONSORED CONTENT
| Apr 24, 2014
Unbuilt and Famous: LEGO releases box set of Bjarke Ingels' LEGO museum
LEGO Architecture has created a box set that customers can use to build replicas of the LEGO Museum, which is not yet built in real life. The museum, designed by the Bjarke Ingels Group, will commemorate the history of LEGO.
| Apr 23, 2014
Ahead of the crowd: How architects can utilize crowdsourcing for project planning
Advanced methods of data collection, applied both prior to design and after opening, are bringing a new focus to the entire planning process.
| Apr 23, 2014
Developers change gears at Atlantic Yards after high-rise modular proves difficult
At 32 stories, the B2 residential tower at Atlantic Yards has been widely lauded as a bellwether for modular construction. But only five floors have been completed in 18 months.
| Apr 23, 2014
Experimental bot transfers CAD plans onto construction sites
The Archibot is intended to take technical data and translate it into full-scale physical markings on construction sites.
| Apr 23, 2014
Mean and Green: Top 10 green building projects for 2014 [slideshow]
The American Institute of Architects' Committee on the Environment has selected the top ten examples of sustainable architecture and ecological design projects that protect and enhance the environment. Projects range from a project for Portland's homeless to public parks to a LEED Platinum campus center.
| Apr 23, 2014
Architecture Billings Index dips in March
The March ABI score was 48.8, down sharply from a mark of 50.7 in February. This score reflects a decrease in design services.
Sponsored | | Apr 23, 2014
Ridgewood High satisfies privacy, daylight and code requirements with fire rated glass
For a recent renovation of a stairwell and exit corridors at Ridgewood High School in Norridge, Ill., the design team specified SuperLite II-XL 60 in GPX Framing for its optical clarity, storefront-like appearance, and high STC ratings.
| Apr 21, 2014
10 design-build best practices
Design-build requires more than a good contract and appropriate risk allocation, says the DBIA. Everyone from the owner to the subcontractors must understand the process, the expectations, and fully engage in the collaboration.