N|V|5 Global, one of the fastest-growing engineering and consulting firms in the industry, has proposed a public offering of 1.27 million shares of its common stock at a price of $79 per share. The company, based in Hollywood, Fla., expects this sale to net an estimated $93.5 million.
BofA Merrill Lynch and Roth Capital Partners are managing the offering, the proceeds from which N|V|5 intends to use for “general corporate purposes” that could include more acquisitions.
Since 2010, N|V|5 Global has acquired more than 25 companies. It transacted its latest purchase last September, when it acquired Marron and Associates, an environmental services firm based in New Mexico with 15 full-time professionals.
N|V|5 focuses primarily on five business verticals: construction quality assurance, infrastructure engineering and support services, energy, program management, and environmental solutions. The Company operates out more than 100 locations nationwide and abroad in Macau, Hong Kong, and Vietnam.
On Wednesday, the company’s stock price hit $90.25 per share, pushing it market capitalization briefly above $1 billion. (Its stock price closed yesterday at $83 per share.)
For the six months ended June 30, N|V|5 reported total revenue of $198.6 million, a 34.3% increase over the same period in 2017. Its net income for this period, $11.9 million, was up more than 80%.
The stock offering is scheduled to close on Monday, after which N|V|5 would still be controlled by insiders,. The company’s Prospectus states that there would be 12,399,000 shares of common stock outstanding after the offering. As of August 3, there were 732 holders of record of N|V|5’s common stock, excluding beneficial owners.
The Prospectus states that the Wright Family Trust has offered an additional 190,500 of its 921,717 shares that underwriters can purchase if they choose to exercise their options within the next 30 days. Dickerson Wright, PE, has been N|V|5’s Chairman and CEO since the company’s inception in 2009.
Related Stories
| Nov 1, 2010
Vancouver’s former Olympic Village shoots for Gold
The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.
| Oct 27, 2010
Grid-neutral education complex to serve students, community
MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.
| Oct 21, 2010
GSA confirms new LEED Gold requirement
The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.
| Oct 18, 2010
World’s first zero-carbon city on track in Abu Dhabi
Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.
| Oct 13, 2010
Editorial
The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.
| Oct 13, 2010
Test run on the HP Z200 SFF Good Value in a Small Package
Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.
| Oct 13, 2010
Prefab Trailblazer
The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.
| Oct 13, 2010
Thought Leader
Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.
| Oct 13, 2010
Hospital tower gets modern makeover
The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.