The final phase of New York’s High Line elevated railway park is slated to open in the fall of 2014. The park will be located between West 30th and West 34th streets to the south and north, and 10th and 12th avenues to the east and west.
The final section, called High Line at the Rail Yards, will be unique from its two predecessors in its aesthetic: the aged, rusted tracks will remain and will be surrounded by natural foliage, rather than manicured perennials.
Friends of the High Line co-founder Joshua David told the New York Times, “People fell in love with the idea that nature had taken over this monumental industrial site.”
There will be one break in that natural feel: Coach’s new building will straddle a section of the new High Line.
In order to preserve parts of the tracks, a path and railing system will be installed to guide visitors safely through the linear park. Other features include a postindustrial jungle gym for children and a planted bowl theater that will jut out along W. 30th Street.
According to Friends of the High Line co-founder Robert Hammond, “Central Park is an escape from the city, an immersion in nature. On the High Line, you’re always aware of the city around you. We wanted to create a space where people could be immersed in nature unlike anywhere else on the High Line.”
Here's a sneak peek at the distinguishing design features of High Line at the Rail Yards:
Related Stories
| Jun 1, 2012
New BD+C University Course on Insulated Metal Panels available
By completing this course, you earn 1.0 HSW/SD AIA Learning Units.
| May 29, 2012
Reconstruction Awards Entry Information
Download a PDF of the Entry Information at the bottom of this page.
| May 29, 2012
Thornton Tomasetti/Fore Solutions provides consulting for Phase I of Acadia Gateway Center
Project receives LEED Gold certification.
| May 24, 2012
2012 Reconstruction Awards Entry Form
Download a PDF of the Entry Form at the bottom of this page.
| Mar 29, 2012
U.K.’s Manchester Airport tower constructed in nine days
Time-lapse video shows construction workers on the jobsite for 222 continuous hours.
| Feb 15, 2012
Skanska secures $87M contract for subway project
The construction value of the project is $261.9 M. Skanska will include its full share, $87 M, in the bookings for Skanska USA Civil for the first quarter 2012.
| Dec 21, 2011
Hoboken Terminal restoration complete
Restoration of ferry slips, expanded service to benefit commuters.
| Dec 19, 2011
Davis Construction breaks ground on new NIAID property
The new offices will total 490,998 square feet in a 10-story building with two wings of 25,000 square feet each.
| Dec 2, 2011
What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20
Nominate a colleague, peer, or even yourself. Applications available here.
| Nov 10, 2011
Suffolk Construction awarded MBTA transit facility and streetscape project
The 21,000-sf project will feature construction of a cable-stayed pedestrian bridge over Ocean Avenue, an elevated plaza deck above Wonderland MBTA Station, a central plaza, and an at-grade pedestrian crossing over Revere Beach Boulevard