flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Oceanic oases: Two new luxury condominiums under construction in South Beach

Oceanic oases: Two new luxury condominiums under construction in South Beach

Plaza has four projects, totaling $498 million in development costs, now under way for The Related Group.


By Plaza Construction | June 11, 2014
Plaza Construction has started construction on two more ultra-luxury condominiums for The Related Group. Included are the $187 million One Ocean, in South Beach, designed by Enrique Norten of Ten Arquitectos, along with The Sieger Suarez Architectural Partnership, as the executive Architect, and the $88 million Marea condominiums, also in South Beach, designed by The Sieger Suarez Architectural Partnership.
 
Totaling $498 million in development costs, Plaza’s four projects now under way for The Related Group also include the new $118 million, 42-story Icon Bay waterfront condominium designed by Arquitectonica and located in the heart of Miami’s Biscayne Corridor, and the $105 million, 42-story Millecento Residences by Pininfarina, located in Miami’s Brickell neighborhood and designed by architect Carlos Ott.
 
Slated for completion in 2015, both the seven-story, 275,141 square foot One Ocean and six-story, 190,654 square foot Marea will offer landscapes by Enzo Enea and interiors by Yabu Pushelberg.  
 
One Ocean, located at the tip of South Beach in the exclusive South of Fifth neighborhood, offers sinuous glass curves and seductive interiors to separate its 46 residences and four Ocean Villas apart from any other. Works of art by José Bedia, Michele Oka Doner and Cuttica will create an imaginative space as part of One Ocean’s professionally curated collection of contemporary art.
 
Marea, also in the South of Fifth neighborhood, will also combine art and design within an atmosphere of tranquility. Complementing its 30 residences, commissioned art installations by Riccardo De Marchi and Markus Linnenbrink will transform its private lobby into an exclusive gallery.
 
Proud recipient of the Contractor of the Year 2013 Award from the American Institute of Architects Miami Chapter, Plaza Construction is one of South Florida’s leading full-service general contractors and construction managers.  Plaza is known for such prestigious projects as the W South Beach hotel, the 67-story Marquis and Canyon Ranch North Tower, to name only a few.  In addition to its current four projects for The Related Group, Brad Meltzer, Principal and President of Plaza’s Southeast Region, stated that Plaza is also constructing:  1 Hotel & Homes South Beach, a premier beachfront redevelopment by The LeFrak Organization, Starwood Capital Group and Invesco Ltd.;  NINE at Mary Brickell Village, a luxurious new 34-story, 390-unit condominium tower at 999 SW 1st Avenue in Miami, under its $65 million contract with Starwood Capital Group and LYND; AC Hotel by Marriott in Miami Beach, the U.S’s first all-new AC Hotel, being developed by Robert Finvarb Companies; and numerous others.  In addition, Plaza recently completed the multimillion-dollar Dadeland Mall Kendall Wing Expansion under its contract with Simon Property Group.  Plaza Construction bases its Southeast Regional operations from 120 NE 27th Street, Suite 600, in Miami.
 
 
 
One Ocean, designed by Enrique Norten of Ten Arquitectos, along with The Sieger Suarez Architectural Partnership.

Related Stories

| Sep 21, 2022

Demand for design services accelerates

Demand for design services from U.S. architecture firms grew at an accelerated pace in August, according to a new report today from The American Institute of Architects (AIA).

K-12 Schools | Sep 21, 2022

Architecture that invites everyone to dance

If “diversity” is being invited to the party in education facilities, “inclusivity” is being asked to dance, writes Emily Pierson-Brown, People Culture Manager with Perkins Eastman.

| Sep 20, 2022

NIBS develops implementation plan for digital transformation of built environment

The National Institute of Building Sciences (NIBS) says it has developed an implementation and launch plan for a sweeping digital transformation of the built environment.

| Sep 20, 2022

New Long Beach office building reflects Mid-Century Modern garden-style motif

The new Long Beach, Calif., headquarters of Laserfiche, a provider of intelligent content management and business process automation software, was built on a brownfield parcel previously considered undevelopable.

| Sep 19, 2022

New York City construction site inspections, enforcement found ‘inadequate’

A new report by the New York State Comptroller found that New York City construction site inspections and regulation enforcement need improvement.

| Sep 16, 2022

Fairfax County, Va., considers impactful code change to reduce flood risk

Fairfax County, Va., in the Washington, D.C., metro region is considering a major code change to reduce the risk from floods.

Multifamily Housing | Sep 15, 2022

Heat Pumps in Multifamily Projects

RMI's Lacey Tan gives the basics of heat pumps and how they can reduce energy costs and carbon emissions in apartment projects.

| Sep 15, 2022

Monthly construction input prices dip in August

Construction input prices decreased 1.4% in August compared to the previous month, according to an Associated Builders and Contractors analysis of U.S. Bureau of Labor Statistics Producer Price Index data released today.

| Sep 15, 2022

First LEED Platinum, net zero and net zero water synagogue opens

Kol Emeth Center, the world’s first LEED Platinum, net zero and net zero water synagogue, opened recently in Palo Alto, Calif.

| Sep 14, 2022

Fires on Amazon warehouse roofs seemingly caused by faulty PV installations

Amazon has made installing solar panels on rooftops a key part of its ESG strategy, but a series of events last year show how challenging greening up major facilities can be.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021