flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Oceanic oases: Two new luxury condominiums under construction in South Beach

Oceanic oases: Two new luxury condominiums under construction in South Beach

Plaza has four projects, totaling $498 million in development costs, now under way for The Related Group.


By Plaza Construction | June 11, 2014
Plaza Construction has started construction on two more ultra-luxury condominiums for The Related Group. Included are the $187 million One Ocean, in South Beach, designed by Enrique Norten of Ten Arquitectos, along with The Sieger Suarez Architectural Partnership, as the executive Architect, and the $88 million Marea condominiums, also in South Beach, designed by The Sieger Suarez Architectural Partnership.
 
Totaling $498 million in development costs, Plaza’s four projects now under way for The Related Group also include the new $118 million, 42-story Icon Bay waterfront condominium designed by Arquitectonica and located in the heart of Miami’s Biscayne Corridor, and the $105 million, 42-story Millecento Residences by Pininfarina, located in Miami’s Brickell neighborhood and designed by architect Carlos Ott.
 
Slated for completion in 2015, both the seven-story, 275,141 square foot One Ocean and six-story, 190,654 square foot Marea will offer landscapes by Enzo Enea and interiors by Yabu Pushelberg.  
 
One Ocean, located at the tip of South Beach in the exclusive South of Fifth neighborhood, offers sinuous glass curves and seductive interiors to separate its 46 residences and four Ocean Villas apart from any other. Works of art by José Bedia, Michele Oka Doner and Cuttica will create an imaginative space as part of One Ocean’s professionally curated collection of contemporary art.
 
Marea, also in the South of Fifth neighborhood, will also combine art and design within an atmosphere of tranquility. Complementing its 30 residences, commissioned art installations by Riccardo De Marchi and Markus Linnenbrink will transform its private lobby into an exclusive gallery.
 
Proud recipient of the Contractor of the Year 2013 Award from the American Institute of Architects Miami Chapter, Plaza Construction is one of South Florida’s leading full-service general contractors and construction managers.  Plaza is known for such prestigious projects as the W South Beach hotel, the 67-story Marquis and Canyon Ranch North Tower, to name only a few.  In addition to its current four projects for The Related Group, Brad Meltzer, Principal and President of Plaza’s Southeast Region, stated that Plaza is also constructing:  1 Hotel & Homes South Beach, a premier beachfront redevelopment by The LeFrak Organization, Starwood Capital Group and Invesco Ltd.;  NINE at Mary Brickell Village, a luxurious new 34-story, 390-unit condominium tower at 999 SW 1st Avenue in Miami, under its $65 million contract with Starwood Capital Group and LYND; AC Hotel by Marriott in Miami Beach, the U.S’s first all-new AC Hotel, being developed by Robert Finvarb Companies; and numerous others.  In addition, Plaza recently completed the multimillion-dollar Dadeland Mall Kendall Wing Expansion under its contract with Simon Property Group.  Plaza Construction bases its Southeast Regional operations from 120 NE 27th Street, Suite 600, in Miami.
 
 
 
One Ocean, designed by Enrique Norten of Ten Arquitectos, along with The Sieger Suarez Architectural Partnership.

Related Stories

Contractors | Apr 20, 2015

Too many construction projects don’t meet owners’ expectations: KPMG report

Causes for delays, overruns, and underperformance include project management talent shortages, distrust between owners and contractors, and the lack of fully integrated project management systems.     

High-rise Construction | Apr 17, 2015

Construction begins on Goettsch Partners-designed Nanning China Resources Center Tower

The tower's design is derived from its multiple uses, which include 170,000 sm of Class A office space, 5,000 sm of boutique retail, and a 45,000-sm luxury Shangri-La hotel.

Museums | Apr 16, 2015

SANAA and Snøhetta tie at first place for Budapest museum bid

The two firms submitted designs for the New National Gallery and Ludwig Museum, one of five planned museums to be constructed in a park just outside the urban center of Hungary’s capital. 

High-rise Construction | Apr 16, 2015

Construction begins on Seattle's Tibet-inspired Potala Tower

Construction on the 41-story Potala Tower in Seattle finally kicked off following a ground-breaking ceremony seven months ago.

Architects | Apr 14, 2015

Jeanne Gang, Bjarke Ingels among participants for inaugural Chicago Architecture Biennial

Some big names include Bjarke Ingels Group and Studio Gang Architects

Sports and Recreational Facilities | Apr 13, 2015

USTA breaks ground on what will be the country’s largest tennis complex

The 63-acre facility is being positioned as a cornerstone for a sports innovation and performance district in Lake Nona, Fla., a 7,000-acre master planned community that continues to expand.

Building Team Awards | Apr 10, 2015

14 projects that push AEC teaming to the limits

From Lean construction to tri-party IPD to advanced BIM/VDC coordination, these 14 Building Teams demonstrate the power of collaboration in delivering award-winning buildings. These are the 2015 Building Team Award winners.

Building Team Awards | Apr 10, 2015

Prefab saves the day for Denver hospital

Mortenson Construction and its partners completed the 831,000-sf, $623 million Saint Joseph Hospital well before the January 1, 2015, deadline, thanks largely to their extensive use of offsite prefabrication.

Building Team Awards | Apr 10, 2015

Anaheim’s soaring intermodal hub

Anaheim's Regional Transportations Intermodal Center is the largest ETFE project in North America.

Building Team Awards | Apr 10, 2015

Virtual collaboration helps complete a hospital in 24 months

PinnacleHealth needed a new hospital STAT! This team delivered it in two years, start to finish.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021