flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Oceanic oases: Two new luxury condominiums under construction in South Beach

Oceanic oases: Two new luxury condominiums under construction in South Beach

Plaza has four projects, totaling $498 million in development costs, now under way for The Related Group.


By Plaza Construction | June 11, 2014
Plaza Construction has started construction on two more ultra-luxury condominiums for The Related Group. Included are the $187 million One Ocean, in South Beach, designed by Enrique Norten of Ten Arquitectos, along with The Sieger Suarez Architectural Partnership, as the executive Architect, and the $88 million Marea condominiums, also in South Beach, designed by The Sieger Suarez Architectural Partnership.
 
Totaling $498 million in development costs, Plaza’s four projects now under way for The Related Group also include the new $118 million, 42-story Icon Bay waterfront condominium designed by Arquitectonica and located in the heart of Miami’s Biscayne Corridor, and the $105 million, 42-story Millecento Residences by Pininfarina, located in Miami’s Brickell neighborhood and designed by architect Carlos Ott.
 
Slated for completion in 2015, both the seven-story, 275,141 square foot One Ocean and six-story, 190,654 square foot Marea will offer landscapes by Enzo Enea and interiors by Yabu Pushelberg.  
 
One Ocean, located at the tip of South Beach in the exclusive South of Fifth neighborhood, offers sinuous glass curves and seductive interiors to separate its 46 residences and four Ocean Villas apart from any other. Works of art by José Bedia, Michele Oka Doner and Cuttica will create an imaginative space as part of One Ocean’s professionally curated collection of contemporary art.
 
Marea, also in the South of Fifth neighborhood, will also combine art and design within an atmosphere of tranquility. Complementing its 30 residences, commissioned art installations by Riccardo De Marchi and Markus Linnenbrink will transform its private lobby into an exclusive gallery.
 
Proud recipient of the Contractor of the Year 2013 Award from the American Institute of Architects Miami Chapter, Plaza Construction is one of South Florida’s leading full-service general contractors and construction managers.  Plaza is known for such prestigious projects as the W South Beach hotel, the 67-story Marquis and Canyon Ranch North Tower, to name only a few.  In addition to its current four projects for The Related Group, Brad Meltzer, Principal and President of Plaza’s Southeast Region, stated that Plaza is also constructing:  1 Hotel & Homes South Beach, a premier beachfront redevelopment by The LeFrak Organization, Starwood Capital Group and Invesco Ltd.;  NINE at Mary Brickell Village, a luxurious new 34-story, 390-unit condominium tower at 999 SW 1st Avenue in Miami, under its $65 million contract with Starwood Capital Group and LYND; AC Hotel by Marriott in Miami Beach, the U.S’s first all-new AC Hotel, being developed by Robert Finvarb Companies; and numerous others.  In addition, Plaza recently completed the multimillion-dollar Dadeland Mall Kendall Wing Expansion under its contract with Simon Property Group.  Plaza Construction bases its Southeast Regional operations from 120 NE 27th Street, Suite 600, in Miami.
 
 
 
One Ocean, designed by Enrique Norten of Ten Arquitectos, along with The Sieger Suarez Architectural Partnership.

Related Stories

| Sep 15, 2014

Perkins+Will unveils design for Ghana's largest hospital

The new hospital will be home to numerous hospital services including public health, accident and emergency, imaging, obstetrics, gynecology, dental, surgical, intensive care and administration.

| Sep 15, 2014

Gen-Y-focused multifamily development under way in L.A.

The new urban residential community at 1001 S. Olive Street will offer open floor plans consisting of 64 studios, 109 one bedroom units, and 28 two-bedroom units, ranging in size from approximately 500 sq ft to 1,100 sq ft. 

| Sep 14, 2014

Ranked: Top Veterans Administration sector AEC firms [2014 Giants 300 Report]

CannonDesign, Clark Group, and URS top BD+C's rankings of the nation's largest Veterans Administration building sector design and construction firms, as reported in the 2014 Giants 300 Report.  

Sponsored | | Sep 13, 2014

5 common questions leaders should never ask

Asking the right questions can help business leaders to anticipate changes, seize opportunities and move their firms in new directions. SPONSORED CONTENT

| Sep 13, 2014

Why CEOs shouldn’t be afraid to ask for outside help

An oven-overlooked factor in assessing the success of a leader, according to organizational development consultant Brook Manville, is his or her ability to go far outside the organization to get help in solving problems. SPONSORED CONTENT

Sponsored | | Sep 13, 2014

Right Way Plumbing finishes first at Max Planck Florida Institute

The Max Planck Florida Institute consists of a three-story, 100,000-sf scientific research facility with 30,000 feet of copper joined with Viega ProPress fittings.

| Sep 12, 2014

Total immersion: Has virtual reality's time finally come?

The emergence of low-cost VR technology means that anyone with a few hundred bucks and a decent workstation can get in the game. But, as our experts reveal, pulling off VR is not so simple.

| Sep 12, 2014

Will on-site parking remain king in the development world?

In spite of the trend away from multi-car residences, not much has changed with regard to parking spot allocations within apartment buildings and other multi-unit residential developments, writes GS&P's Doug Sharp.

| Sep 11, 2014

5 competing designs unveiled for Presidio Parklands in San Francisco

To turn the underdeveloped area by Chrissy Field into new public space, San Francisco's Presidio Trust unveiled the five designs by five teams they invited earlier this year.

| Sep 11, 2014

Cintas invites public to vote for 'America's best restroom'

For the 13th consecutive year, Cintas Corporation is back with its popular America’s Best Restroom Contest. A team of survey editors once again scanned the country for the most creative and clean public restrooms and produced a crop of nominees sure to please.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021