flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Oceanic oases: Two new luxury condominiums under construction in South Beach

Oceanic oases: Two new luxury condominiums under construction in South Beach

Plaza has four projects, totaling $498 million in development costs, now under way for The Related Group.


By Plaza Construction | June 11, 2014
Plaza Construction has started construction on two more ultra-luxury condominiums for The Related Group. Included are the $187 million One Ocean, in South Beach, designed by Enrique Norten of Ten Arquitectos, along with The Sieger Suarez Architectural Partnership, as the executive Architect, and the $88 million Marea condominiums, also in South Beach, designed by The Sieger Suarez Architectural Partnership.
 
Totaling $498 million in development costs, Plaza’s four projects now under way for The Related Group also include the new $118 million, 42-story Icon Bay waterfront condominium designed by Arquitectonica and located in the heart of Miami’s Biscayne Corridor, and the $105 million, 42-story Millecento Residences by Pininfarina, located in Miami’s Brickell neighborhood and designed by architect Carlos Ott.
 
Slated for completion in 2015, both the seven-story, 275,141 square foot One Ocean and six-story, 190,654 square foot Marea will offer landscapes by Enzo Enea and interiors by Yabu Pushelberg.  
 
One Ocean, located at the tip of South Beach in the exclusive South of Fifth neighborhood, offers sinuous glass curves and seductive interiors to separate its 46 residences and four Ocean Villas apart from any other. Works of art by José Bedia, Michele Oka Doner and Cuttica will create an imaginative space as part of One Ocean’s professionally curated collection of contemporary art.
 
Marea, also in the South of Fifth neighborhood, will also combine art and design within an atmosphere of tranquility. Complementing its 30 residences, commissioned art installations by Riccardo De Marchi and Markus Linnenbrink will transform its private lobby into an exclusive gallery.
 
Proud recipient of the Contractor of the Year 2013 Award from the American Institute of Architects Miami Chapter, Plaza Construction is one of South Florida’s leading full-service general contractors and construction managers.  Plaza is known for such prestigious projects as the W South Beach hotel, the 67-story Marquis and Canyon Ranch North Tower, to name only a few.  In addition to its current four projects for The Related Group, Brad Meltzer, Principal and President of Plaza’s Southeast Region, stated that Plaza is also constructing:  1 Hotel & Homes South Beach, a premier beachfront redevelopment by The LeFrak Organization, Starwood Capital Group and Invesco Ltd.;  NINE at Mary Brickell Village, a luxurious new 34-story, 390-unit condominium tower at 999 SW 1st Avenue in Miami, under its $65 million contract with Starwood Capital Group and LYND; AC Hotel by Marriott in Miami Beach, the U.S’s first all-new AC Hotel, being developed by Robert Finvarb Companies; and numerous others.  In addition, Plaza recently completed the multimillion-dollar Dadeland Mall Kendall Wing Expansion under its contract with Simon Property Group.  Plaza Construction bases its Southeast Regional operations from 120 NE 27th Street, Suite 600, in Miami.
 
 
 
One Ocean, designed by Enrique Norten of Ten Arquitectos, along with The Sieger Suarez Architectural Partnership.

Related Stories

| Feb 29, 2012

Construction begins on Keller Army Community Hospital addition

The 51,000 square foot addition will become the home for optometry, ophthalmology, physical therapy, and orthopedics clinics, as well as provide TRICARE office space.

| Feb 29, 2012

Carvalho appointed Shawmut Safety Director

He has been a driving force behind multiple safety-orientated initiatives at Shawmut, including Safety Week, the creation of an online safety manual, and the implementation of a new safety reporting and tracking system. 

| Feb 29, 2012

Shepley Bulfinch selected to design new Children’s Hospital of Buffalo

The firm was selected because of their past experience in designing clinically complex facilities that emphasize patient- and family-centered care and operational efficiency as well as distinctive architectural forms for many other children's and women's hospitals.

| Feb 28, 2012

Roofing contractors recognized for workmanship

Sika Sarnafil announces Project of the Year winners; competition highlights visually stunning, energy efficient, and sustainable roofs.

| Feb 28, 2012

Waste Management awards companies for sustainable construction

This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.

| Feb 28, 2012

Salem State University Library & Learning Commons topped off

When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite. 

| Feb 28, 2012

More than 1,000 have earned EDAC certification since 2009

Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.

| Feb 28, 2012

McCarthy completes second phase of San Diego’s Scripps Hospital

Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space. 

| Feb 28, 2012

LUMEnergi names Weinbaum president and CEO

Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.

| Feb 28, 2012

Griffin Electric completes Medical University of South Carolina project

The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021