flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

An old Ford factory in Pittsburgh is being adapted to become a biomedical research facility

Adaptive Reuse

An old Ford factory in Pittsburgh is being adapted to become a biomedical research facility

This is the latest step in the city’s post-industrial resurgence.


By John Caulfield, Senior Editor | June 2, 2021
The Assembly is an adaptive reuse of a Ford factory and showroom

The Assembly will have 108,000 sf of leasable space. Images: Courtesy of Wexford Science & Technology

A former Ford Motor Company assembly plant in Pittsburgh, which was built in 1915 as a factory and showroom for Model Ts, is being transformed into a research, innovation, and entrepreneurship hub called The Assembly.

A team led by Wexford Science & Technology and the University of Pittsburgh is adding 105,000 sf to the plant’s original 250,000 sf. The enlarged building will house labs and office spaces, an in-building parking garage with a secured bike room and showers; gathering, event, and conference spaces; a 250-seat auditorium, and a restaurant and café.

Gathering spaces have access to the building's three floors.

The Assembly will provide ample space for gatherings and events. The stairwell access to each floor is one of Wexford's design signatures.

 

The Assembly, which is scheduled to open early next year, will be the future home to the university’s researchers who are focused on discoveries related to cancer biology and other areas. The final beam for this project was secured on May 25, an event that was applauded by over 300 construction workers on site.

Also see: Pittsburgh’s Neighborhood 91 for additive manufacturing

ANOTHER INNOVATION CORNERSTONE

Model Ts being assembled in the Ford plant

Ford Motor Company made Model Ts in this plant for more that 30 years.

 

Wexford’s website states that this adaptive reuse and renovation will create a 345,000-sf, three-story facility with 36,000-sf floor plates with 14-ft 6-inch floor-to-floor heights, and 108,000 sf of rentable space. The Assembly is located in Pittsburgh’s Baum-Centre corridor, a mass-transit oriented urban district designed to serve businesses.

Also see: Pittsburgh combats construction fraud

“These state-of-the-art labs, dramatic convening spaces, and top-tier researchers will attract the talent, ideas, and companies that will continue to propel life science innovation in Pittsburgh,” says John Grady, Wexford’s Northeast Region Executive and Senior VP of Development.

ZGF Architects designed the renovation. Turner Construction, Ventas Inc., and Bank of America are Wexford’s other partners on this project, which rivals in scale the Mill 19 redevelopment at Hazelwood Green.

“The Assembly is a cornerstone of the Pittsburgh Innovation District,” says Sean Luther, Executive Director of InnovatePGH, a public-private partnership that supports innovation growth in Pittsburgh. “Fully leveraging Pittsburgh’s life science assets requires exactly the intentionally designed, multi-tenant facilities developed by Wexford. The Assembly represents the full vision and potential of the Pittsburgh Innovation District to translate academic research into economic development that benefits all of Western Pennsylvania.”

This $330 million redevelopment project broke ground in the summer of 2019. The year before, the building was added to the National Register of Historic Places. Ford made and sold cars out of this eight-story plant for more than 30 years.

Related Stories

Adaptive Reuse | May 7, 2018

A decade after it debuted, Beijing’s 798 Arts District is still a work in progress

China’s third-most-popular tourist attraction remains a magnet for creative tenants.

Adaptive Reuse | Apr 26, 2018

Edison Lofts building is New Jersey’s largest non-waterfront adaptive reuse project

Minno & Wasko Architects & Planners designed the building.

Adaptive Reuse | Mar 8, 2018

LEED Platinum for Memphis industrial reuse project

Memphis-based engineering firm OGCB and contractor Grinder Tabor Grinder led the removal of 54 million lb of concrete and 10 million lb of metal.

Multifamily Housing | Feb 27, 2018

Victorian era gasholders become modern residences in London

The new residences are part of the King’s Cross redevelopment scheme.

Education Facilities | Jan 8, 2018

Three former school buildings are repurposed to create mini-campus for teacher education

The $25.3 million project is currently under construction on the Winona State University campus.

Adaptive Reuse | Jan 4, 2018

Student housing development on Chapman University campus includes adaptive reuse of 1918 packing house

The Packing House was originally built for the Santiago Orange Growers Association.

Adaptive Reuse | Dec 11, 2017

Detroit's economic improvement a boon to its hotel sector

Detroit Foundation, a stylish boutique hotel, is the Motor City’s newest hospitality venue.

Adaptive Reuse | Nov 29, 2017

‘Eat-ertainment’ establishment grants abandoned air traffic control building a second life

The concept’s design reflects the golden age of flight.

Adaptive Reuse | Nov 10, 2017

Austin’s first indoor shopping mall becomes Austin Community College’s new digital media center

Renovation of the defunct mall represents Phase 2 of ACC’s $100 million adaptive reuse project.

Adaptive Reuse | Oct 23, 2017

A tableware storage space is reset to accommodate an investment firm’s headquarters in Raleigh, N.C.

This adaptive reuse establishes more direct visual and physical connections to a growing city. 

boombox1
boombox2
native1

More In Category


MFPRO+ News

San Francisco unveils guidelines to streamline office-to-residential conversions

The San Francisco Department of Building Inspection announced a series of new building code guidelines clarifying adaptive reuse code provisions and exceptions for converting office-to-residential buildings. Developed in response to the Commercial to Residential Adaptive Reuse program established in July 2023, the guidelines aim to increase the viability of converting underutilized office buildings into housing by reducing regulatory barriers in specific zoning districts downtown. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021