Oregon will spend $300 million in construction bond funding for seismic updates on public buildings.
The funds are included in the legislature’s $1.2 billion capital construction budget. Sen. Peter Courtney, the state’s Senate president, said the allotment for seismic updates is more than lawmakers have ever put toward such projects, according to the Portland Business Journal.
“We know there will be a major quake. We know too many of our schools will collapse," Courtney said. "These funds will help us fix our schools. These funds will save children’s lives.”
The bond funding plan dedicates $175 million for the Seismic Rehabilitation Grant Program, a program that helps make at-risk schools safer in the event of a major earthquake.
A 2007 Oregon Department of Geology and Mineral Industries survey found that more than 1,000 Oregon school buildings face a high risk of collapse during earthquakes.
Related Stories
Codes and Standards | Dec 5, 2018
Canadian retailer builds net-zero stores
Other chains also boost green efforts with PVs, EV charging stations.
Codes and Standards | Dec 4, 2018
Action on building codes would spur low-carbon cities
Faster retrofit cycles, increased energy-efficiency requirements for existing buildings needed.
Codes and Standards | Nov 30, 2018
Best solution to prevent California wildfire disasters: Stop building in places likely to burn
Approach would be unpopular as people attracted to stunning wooded landscapes.
Codes and Standards | Nov 29, 2018
USGBC and BRE form partnership
Two green standards groups will collaborate on standards, platforms, and research.
Codes and Standards | Nov 29, 2018
Parking garages in N.Y. State will have to be inspected every three years
Professional engineer must assess conditions.
Codes and Standards | Nov 28, 2018
To build water-efficient cities, water managers and urban planners must coordinate better
Lack of time and resources, and practitioners not in habit of working together hamper efforts.
Codes and Standards | Nov 27, 2018
AAMA updates specification for roller assemblies in sliding doors, and lift and slide doors
Last update was in 2015.
Codes and Standards | Nov 26, 2018
All LEED-certified buildings eligible for LEED recertification
Projects must submit 12 months of data demonstrating continued or improved performance.
Codes and Standards | Nov 20, 2018
OSHA publishes updates to crane operator certification requirements
Long-delayed rules accept certifications by type or type and capacity.
Codes and Standards | Nov 19, 2018
Guide offers understanding of elements that create successful multi-floor communal spaces
CTBUH technical document analyzes how to approach tall urban habitat.