flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Oregon State University builds a first-of-its-kind mass timber research lab

Mass Timber

Oregon State University builds a first-of-its-kind mass timber research lab

The Huang Collaborative Innovation Complex features an innovative use of mass timber that reduces embodied carbon emissions by 108%.


By Novid Parsi, Contributing Editor  | June 26, 2024
Jen-Hsun Huang and Lori Mills Huang Collaborative Innovation Complex at Oregon State University aims to be the first all-mass-timber lab meeting rigorous vibration criteria, design by ZGF
Rendering: ZGF Architects

In Corvallis, Ore., the Jen-Hsun Huang and Lori Mills Huang Collaborative Innovation Complex at Oregon State University aims to achieve a distinction among the world’s experimental research labs: It will be the first all mass timber lab meeting rigorous vibration criteria (2000 micro-inches per second, or MIPS).

Designed by ZGF Architects, the $213 million Huang Collaborative Innovation Complex, which broke ground in April, will be both a teaching center and a home for team-based transdisciplinary research on global challenges involving climate science, clean energy, and water resources. The center also will support research and learning in artificial intelligence, robotics, and materials science. 

The three-level, 143,000-sf building features flexible experimental and computational laboratories, a 12,000-sf clean room, undergraduate student space, and cross-functional collaborative spaces.

The center also will harness one of the nation’s most powerful supercomputers, showcased on the public ground floor. The supercomputer’s rejected heat will help heat the building, which has the potential to become net zero operational carbon on an annual basis by 2030.

For the first-of-its-kind mass timber structure, ZGF collaborated with OSU’s College of Forestry to leverage its expertise in wood and regional forestry practices. To meet the vibration criteria of 2000 MIPS in mass timber, the project team created a structural bay in the lab interiors comprising mass timber columns, beams, and a composite deck. 

This carbon-negative innovation not only provides the structural stability needed for the use of sensitive scientific equipment, it also reduces embodied carbon emissions by 108% compared to the traditional all-concrete approach. In addition, the exposed wood creates a beautiful interior environment and an inviting academic and research environment. 

“We discovered over the course of planning that with careful coordination between the structure and building systems, mass timber works really well for research buildings,” Vladimir Pajkic, lead designer and partner at ZGF, said in a statement.

On the outside, electrochromic glass, in conjunction with intelligent building controls, changes tint based on the sun’s position and the level of cloudiness. Along with façade glazing and shading strategies, these smart windows increase daylight, reduce peak cooling load, and create a visually comfortable space.

On the Building Team:
Owner: Oregon State University
Design architect and architect of record: ZGF Architects
MEP engineer: AEI
Structural engineer: KPFF
General contractor: Andersen Construction

Jen-Hsun Huang and Lori Mills Huang Collaborative Innovation Complex at Oregon State University aims to be the first all-mass-timber lab meeting rigorous vibration criteria, design by ZGF
Rendering: ZGF Architects
Jen-Hsun Huang and Lori Mills Huang Collaborative Innovation Complex at Oregon State University aims to be the first all-mass-timber lab meeting rigorous vibration criteria, design by ZGF
Rendering: ZGF Architects
Jen-Hsun Huang and Lori Mills Huang Collaborative Innovation Complex at Oregon State University aims to be the first all-mass-timber lab meeting rigorous vibration criteria, design by ZGF
Rendering: ZGF Architects
Jen-Hsun Huang and Lori Mills Huang Collaborative Innovation Complex at Oregon State University aims to be the first all-mass-timber lab meeting rigorous vibration criteria, design by ZGF
Rendering: ZGF Architects
Jen-Hsun Huang and Lori Mills Huang Collaborative Innovation Complex at Oregon State University aims to be the first all-mass-timber lab meeting rigorous vibration criteria, design by ZGF
Rendering: ZGF Architects
Jen-Hsun Huang and Lori Mills Huang Collaborative Innovation Complex at Oregon State University aims to be the first all-mass-timber lab meeting rigorous vibration criteria, design by ZGF
Rendering: ZGF Architects

Related Stories

Laboratories | Sep 12, 2017

New York City is positioning itself as a life sciences hub

A new Transwestern report highlights favorable market and regulatory changes.

Laboratories | Aug 3, 2017

Today’s university lab building by the numbers

A three-month study of science facilities conducted by Shepley Bulfinch reveals key findings related to space allocation, size, and cost. 

Laboratories | Jul 18, 2017

Pfizer breaks ground on new R&D campus in St. Louis suburb

The facility will consolidate the company’s local workforce, and provide flexible work and research spaces.  

Building Team Awards | Jun 12, 2017

The right prescription: University of North Dakota School of Medicine & Health Sciences

Silver Award: North Dakota builds a new medical/health sciences school to train and retain more physicians.

Laboratories | Apr 13, 2017

How to design transformative scientific spaces? Put people first

While most labs are designed to achieve that basic functionality, a transformational lab environment prioritizes a science organization’s most valuable assets: its people.

Laboratories | Sep 26, 2016

Construction has finished on the world’s largest forensic anthropology lab, designed by SmithGroupJJR

The lab’s main purpose will be to help in the investigation, recovery, and accounting of Americans lost in past wars.

Laboratories | Aug 8, 2016

The lab of the future: smaller, flexible, tech-enabled, business focused

A new CBRE report emphasizes the importance of collaboration and standardization in lab design.

Laboratories | Jun 16, 2016

How HOK achieved design consensus for London's Francis Crick Institute

The 980,000-sf, $931 million facility is the result of a unique financing mechanism that brought together three of the U.K.’s heaviest funders of biomedical research—the Medical Research Council, Cancer Research UK, and the Wellcome Trust—and three leading universities—University College London, Imperial College London, and King’s College London.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021