flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Overuse of air conditioning hurts office productivity

Codes and Standards

Overuse of air conditioning hurts office productivity

A study found temperatures in the low 70s reduce worker performance.


By Peter Fabris, Contributing Editor | September 1, 2016

Pixabay Public Domain

Setting the air conditioning too high in an office is not only irresponsible from an energy use standpoint, it also degrades employee productivity.

There is strong data to back that premise. The director of the Human Factors and Ergonomics Laboratory at Cornell University pointed to a study that found offices with temperatures in the low 70s reduced the output of employees and led to increased mistakes.

The study measured the number of keystrokes employees typed in an office. In a 78F environment, workers produced more than twice as many keystrokes as those in a 70-degree environment. Productivity rose along with temperature in a linear fashion into the high 70s. It began to drop when temperatures reached the mid-80s.

The cold is distracting, with people doing things like rubbing their hands together for warmth. This issue may be impacted by the increased popularity of lighter, more casual wear in the office. De facto cooling temperature standards of 68F to 72F were established in the 1960s when business suits were the dominant office attire.

Related Stories

Green Specifications | Jul 26, 2016

New Miami Beach law requires LEED certification on projects larger than 7,000 sf

LEED Silver the prescribed standard on buildings larger than 50,000 sf.

Energy | Jul 25, 2016

Michigan law provides local governments with flexible energy conservation financing

Allows cities to fund projects without adding debt.  

Contractors | Jul 15, 2016

Trade unions, contractors call for maximum penalty in construction worker death case

‘Sick and tired’ of lawbreaking contractors defining public perception.  

Multifamily Housing | Jul 14, 2016

Portland, Ore., City Council approves construction excise tax for affordable housing

Expected to raise $8 million annually on commercial and residential projects.  

Drones | Jul 13, 2016

FAA issues final rule on commercial use of drones

The rule covers commercial uses for drones that weigh less than 55 pounds, and it takes effect Aug. 29.  

Codes and Standards | Jul 12, 2016

OSHA raises maximum civil penalties by 78%

Applies to infractions that occurred after Nov. 2, 2015.  

School Construction | Jul 11, 2016

Fight over school funding in Arizona headed to court

Legislature accused of ignoring 1994 ruling ordering state to pick up some of the costs.  

Green Specifications | Jul 8, 2016

World Green Building Council sets goal of 100% net-zero buildings by 2050

All new buildings and major renovations to be net-zero by 2030.  

Market Data | Jul 7, 2016

Airbnb alleged to worsen housing crunch in New York City

Allegedly removing thousands of housing units from market, driving up rents.

Urban Planning | Jul 7, 2016

Y Combinator project would build new city using new technology, urban policies

Zoning, property rights, building codes all could be re-imagined.  

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021