flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Owen Hall, Michigan State University, East Lansing, Mich.

Owen Hall, Michigan State University, East Lansing, Mich.


By By Jay W. Schneider, Editor | October 12, 2010

Officials at Michigan State University’s East Lansing Campus were concerned that Owen Hall, a mid-20th-century residence facility, was no longer attracting much interest from its target audience, graduate and international students. Although the facility enjoyed a choice location on campus, students were finding more modern and better appointed options off campus. Hoping to renew interest in its faded facility, MSU engaged the Building Team of SmithGroup (architect and MEP engineer) and Triangle Associates (CM) to significantly upgrade the facility’s community spaces. The university wanted its $9 million makeover to have a “Wow!” factor.

Bold colors, a modern lighting scheme, and an open floor plan inject new excitement and energy into the building while also staying true to the original 1961 aesthetic of clean lines, simple forms, and minimal decoration. The project team had only nine months (including planning, design, and construction) to inject 21st-century modernity into the residence.

 Work focused on two floors and 39,000 sf of space within the seven-story, 60,000-sf facility. Creating synergy between the lower level and the first floor was key to making the space feel more open, so two cutouts were made in the floor between the two levels.  The openings give residents better sightlines throughout both floors and views into the new dining center, game room, and social/lounge spaces.

The dining center became a multipurpose eating/study lounge with a coffee shop and an emporium-style servery named “Riverwalk Market.” A significantly upgraded game room/TV lounge on the lower level connects to the community kitchen, where students can prepare their own meals. Private study spaces are scattered throughout the rehabbed areas.

Lighting played a significant role in the facility’s redesign. A bold green ribbon with a white LED edge light runs throughout the space, uniting the two floors and acting as a circulation element. LEDs also make the acrylic reception desk glow. Track lighting and general ambient lighting are used throughout. Despite the lighting’s high design, the system performs 26% below ASHRAE standards.

“The team did its job well,” said Reconstruction Awards judge Martha Bell, FAIA, LEED AP, principal, Tilton, Kelly+Bell, Chicago. “The facility is compelling and attractive to students, and the renovation is true to the building’s 1960s roots.” BD+C

PROJECT SUMMARY

Building Team

Submitting firm: SmithGroup (architect, MEP engineer)

Owner: Michigan State University

CM: Triangle Associates

General Information

Size: 39,000 gsf

Construction cost: $9 million

Construction period: May 2008 to August 2009

Delivery method: CM

Related Stories

| Jul 23, 2012

Missner Group completes construction of Chicago auto dealership

The Missner Group also incorporated numerous sustainable improvements to the property including the implementation of a vegetative roof, and the utilization of permeable pavers for the parking lot.

| Jul 20, 2012

2012 Giants 300 Special Report

Ranking the leading firms in Architecture, Engineering, and Construction.

| Jul 20, 2012

Data Centers Report: Demand ‘exploding’

BD+C's Giants 300 Top 25 AEC Firms in the Data Center sector.

| Jul 20, 2012

Office Report: Fitouts, renovations keep sector moving

BD+C's Giants 300 Top 25 AEC Firms in the Office sector.

| Jul 20, 2012

K-12 Schools Report: ‘A lot of pent-up need,’ with optimism for ’13

The Giants 300 Top 25 AEC Firms in the K-12 Schools Sector.

| Jul 20, 2012

Higher education market holding steady

But Giants 300 University AEC Firms aren’t expecting a flood of new work.

| Jul 20, 2012

3 important trends in hospital design that Healthcare Giants are watching closely

BD+C’s Giants 300 reveals top AEC firms in the healthcare sector.

| Jul 20, 2012

Global boom for hotels; for retail, not so much

The Giants 300 Top 10 Firms in the Hospitality and Retail sectors.

| Jul 20, 2012

Firms bracing for DoD cuts

The Giants 300 Top 25 AEC Firms in the Military sector.

| Jul 20, 2012

Gensler, Stantec, Turner lead ‘green’ firms

The Top 10 AEC Firms in Green Buildings and LEED Accredited Staff.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021