The Mercedes-Benz Stadium in Atlanta opened in August of 2017 to great fanfare. Driven by Arthur Blank’s vision to “build a venue that would not only exceed expectations, but also push the limits of what was possible in terms of stadium design, fan experience and sustainability,” the new stadium truly changed the game for sports stadiums.
Bill Johnson, design principal for HOK, brought together experts from across the country to help realize the revolutionary engineering, design, and functionality envisioned for the $1.5 billion Mercedes-Benz Stadium project. The integrated team used a “top down” approach – literally – by envisioning the roof as the central design piece that would inform other elements to deliver a cohesive finished result.
Owens Corning experts joined Tennessee-based Porter Roofing contractors and Atlanta-based Larimer/Shannon Group to consult throughout the design and installation phases of the retractable roof. The collaboration led to the use of the Owens Corning® FOAMULAR® 1000 high-strength extruded polystyrene (XPS) insulation to support Johnson’s state-of-the-art roof design.
Open and Closed Case for a Groundbreaking Roof
Inspired by the Pantheon in Rome with a circular opening in the domed roof, Johnson set out to challenge conventional retractable roof design by marrying physics, design and product solutions that delivered. A key design challenge quickly became the sheer weight involved with the design of the petal-like pieces intended to open and close similar to a camera lens.
Designed for use in engineered applications requiring additional load-bearing capability, Owens Corning® FOAMULAR® 1000 was selected as the insulation for the roof design. Proven to help resist damage from heavy loads with 100 psi compressive strengths, the unique closed-cell structure of FOAMULAR® XPS also helps to make it highly durable and resistant to moisture, retaining its excellent R-value even following prolonged exposure to moisture and freeze/thaw cycling.
After a series of models and tests working through the physics and weigh considerations, the team moved forward with the intricate and complex retractable roof design featuring eight triangular translucent panels creating the illusion of extended bird's wings when open. To achieve this automated movement, each segment would move alongside each other, sliding on its own linear track.
To accomplish this, the team immediately was faced with calibrating precise measurements that would accommodate the three different sized mechanized petals required to converge seamlessly in the oval opening. The Owens Corning team worked hand in hand with Porter Roofing to specialty cut FOAMULAR® XPS in tapered sizes supporting each of the petals.
The attention to detail on the state-of-the-art roof was time consuming. So, while it was the first design element addressed – it was the last to get finalized. When the LEED platinum certified stadium opened in 2017, the retractable roof system still required some additional fine-tuning.
The final construction phase of the roof was completed in July 2018 when it successfully opened and closed from the touch of a button in less than 12 minutes. Due to its impressive stats, the finished Mercedes-Benz Stadium has been hailed as revolutionary in its design, engineering, functionality, sustainability, technology, and fan-friendliness.
For more information on the Owens Corning® FOAMULAR® 1000 solution featured in the Mercedes-Benz Stadium, please visit https://www.owenscorning.com/insulation/commercial or call 1-800-GET-PINK®.
Related Stories
Sponsored | Roofing | Aug 30, 2019
A New Twist on TPO: Firestone UltraPly™ TPO Flex Adhered
The most flexible TPO on the market* makes complex jobs easier.
Sponsored | Roofing | Jul 24, 2018
Metal roofs take the residential market by storm
As metal roofing soars in popularity, so do the aesthetic options.
Sponsored | Roofing | Jun 22, 2018
U.S. Coast Guard Headquarters - vegetative roof assembly, Washington, D.C.
A cross-functional team collaborated throughout the three-phased VRA construction.
Sponsored | Roofing | Mar 21, 2018
Renovation at Cincinnati Music Hall includes new automatic smoke vents for life safety
Workers tackled a 16-month, $143-million project at Cincinnati Music Hall, and finished the project last October.
Codes and Standards | Nov 16, 2017
White roofing isn’t always the best choice
Adverse effects include heat reflection onto nearby walls.
Green | Sep 12, 2017
Brooklyn’s Windsor Terrace Library gets a living roof
The roof was funded through a process that allows local residents to decide how City capital dollars are spent in their neighborhoods.
Building Enclosure Systems | Jul 26, 2017
Balcony and roof railings and the code: Maintain, repair, or replace? [AIA course]
Lacking familiarity with current requirements, some owners or managers complete a roof or balcony rehabilitation, only to learn after the fact that they need to tear noncompliant railings out of their new roof or terrace and install new ones.
Roofing | Jul 17, 2017
EclipseEdge eases installation of raised roof edges, gravel stops, and full coping caps
The EclipseEdge edge metal profile uses a two-part design with a base and a top cover to eliminate steps often required in traditional installations.
Sponsored | Roofing | Jun 29, 2017
Metal roofs are soaring in popularity in the residential market
The Metal Roofing Alliance estimates that 750,000 metal roofs were installed on U.S. homes in 2015.