Cost isn’t the only thing on building owners’ minds these days, but it certainly informs their choices of AEC partners, projects, and products. This is one of the many takeaways from BD+C’s inaugural Owners Survey Report, which collected input from 156 building owners and developers throughout December 2020 and January 2021 on a variety of topics: their top development challenges, what they look for in AEC firm partners, and their most promising innovations.
The survey findings point to a growing demand for collaboration and partnership during these chaotic times—and mounting frustration over a lack of focus and discipline among their AEC firm partners around project costs.
“Architects and designers need to work within a budget,” said Michael Vachio, LEED AP, Vice President of Development and Construction for JL Capital in Hawaii. “The value engineering phase of a project is becoming longer and larger.”
Time and again, in their comments, owners asserted that AEC firms don’t listen to their concerns, especially—but not exclusively—about taming a project’s cost. Owners also claimed they want closer collaboration with their teams, subs, and suppliers, some to the point of encouraging integrated project delivery methods that ultimately speed the construction process.
At the very least, AEC firms might reconsider how they pitch projects, with an eye toward appreciating the owner’s perspective.
AEC firms also need to overcome some owners’ lingering skepticism about investing in strategies that are environmentally responsible but whose implementation costs “impact the rents tenants are willing to pay and [what] financial institutions are willing to lend in some markets,” said Cassie Paben, Director of Business Development for Tetrad Property Group.
Click To Download BD+C's 2021 Owners Survey Report
This exclusive BD+C survey of 156 building owners and developers explores the changing and most-pressing needs of this highly influential group. From project financing to client service to design, construction, and operations, this research breaks down emerging trends, innovations, and the biggest wants and needs among owners/developers. The survey covers:
• What owners/developers look for in an AEC firm
• Biggest development challenges
• Top health/wellness/environmental strategies on projects
• Single-biggest innovation implemented on projects
• Response to the COVID-19 pandemic.
Download the 16-page PDF report with the complete findings from BD+C's 2021 Owners Survey. Thanks!
That being said, AEC firms should also test those waters to see if owners are prepared to enter into contractual commitments necessary for establishing accountable and financial collaboration on both sides.
Owner–AEC relations that work usually boil down to trust. Our survey reveals that, perhaps more than ever, owners are turning to their AEC partners to help their companies and projects take advantage of the
latest products and best practices in such areas as technology, building systems, energy efficiency, and sustainability.
Our survey’s respondents sounded eager to try out new ideas that deliver predictable ROIs. But as one owner conceded, the industry is moving faster than any one company can keep up with. AEC firms only increase their value when they provide practical solutions for projects that factor in an owner’s budgetary, marketing, and operational parameters, as well as end-user and occupant comfort.
Download the Owners Survey Report at: BDCnetwork.com/OwnerSurvey2021.
Related Stories
| Apr 13, 2012
Goettsch Partners designs new music building for Northwestern
The showcase facility is the recital hall, an intimate, two-level space with undulating walls of wood that provide optimal acoustics and lead to the stage, as well as a 50-foot-high wall of cable-supported, double-skin glass
| Apr 6, 2012
Flat tower green building concept the un-skycraper
A team of French designers unveil the “Flat Tower” design, a second place winner in the 2011 eVolo skyscraper competition.
| Apr 3, 2012
Product Solutions
Two new PV systems; a lighter shelf; and fire alarm/emergency communication system.
| Apr 3, 2012
Luxury hotel 'groundscraper' planned in abandoned quarry
Would you spend $300 a night to sleep underground? You might, once you see the designs for China's latest hotel project.
| Apr 3, 2012
SSOE acquires MEP Firm CRS Engineering & Design Consultants
The acquisition will expand SSOE’s Southeastern U.S. presence, broaden CRS’s reach to international markets, and provide both firms’ clients access to enhanced services and resources.
| Mar 30, 2012
18 handy tablet apps for AEC professionals
Check out these helpful apps for everyday design and construction tasks. Our favorite: MagicPlan, which uses GPS to help you measure and draw a floor plan of any room.
| Mar 22, 2012
Hawaiian architecture firm chooses FRP trellis system over traditional materials
MGA Architecture plans to add five more trellis systems on the neighboring building.
| Mar 13, 2012
Worker office space to drop below 100-sf in five years
The average for all companies for square feet per worker in 2017 will be 151 sf, compared to 176 sf, and 225 sf in 2010.
| Feb 15, 2012
Englewood Construction announces new projects with Destination Maternity, American Girl
Englewood’s newest project for Wisconsin-based doll retailer American Girl, the company will combine four vacant storefronts into one large 15,000 square-foot retail space for American Girl.
| Feb 2, 2012
Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012
Winning projects will be featured in the May issue of BD+C.