The new Robert W. Plaster Center for Advanced Manufacturing at Ozarks Technical Community College in Springfield, Mo., is a first-of-a-kind educational asset in the region. The 125,000-sf facility will educate and train a new generation in high tech, clean manufacturing and fabrication.
Strong, metallic materials and geometric forms make up the shining facade, creating a modern, creative feel. Flexibility was a key goal of the program; thus, the Center is designed to be open, with tracks for movable walls to adjust to varying class sizes and new configurations.
The building’s core is a workshop high bay area, featuring more than 30,000 sf of active learning environments that are double- and triple-height, encased in steel and glass. This design element puts the work of students and industry partner collaboration on display.
These spaces are stocked with advanced equipment, including 3D printers, laser cutters, robotic welders, computer-aided lathes, mechatronics stations, and an overhead gantry crane.
Classrooms are arranged alongside the high bay for seamless transitions from class to lab, while the glass collaboration zones overlook a 500-foot-long high bay space that is leasable to relocating or start-up companies. This area fronts one of Springfield’s main thoroughfares.
The new facility occupies a long, skinny site, and needed to provide tractor trailer access at multiple points. This created a design challenge to fit in with the pedestrian-friendly campus.
Like stitches holding different pieces of fabric together, the places between academic spaces pull together the large, open spaces full of glass and steel with playful, warm wood details bringing warmth to quiet study spaces. The flexible design encourages and supports both short- and longer-term training opportunities with a range of learning environments, including:
- Specialized hands-on learning environments
- Customizable simulation training centers
- Long-distance learning space
- Research and development labs
- Designated process-improvement space
- Business incubation test centers
- A large high-bay environment for industry-led projects.
A large assembly stair occupies the two-story lobby, flooded with daylight and equipped for presentations to large groups from busloads of middle school students to corporate investors.
On the project team:
Owner and/or developer: Ozarks Technical Community College
Design architect: Perkins and Will
Architect of record: Dake Wells Architecture
MEP engineers: Antella Consulting Engineers (electrical engineer); Henderson Engineers (mechanical, plumbing, fire protection engineer)
Structural engineer: J&M Engineering
General contractor/construction manager: Crossland Construction
Related Stories
| Mar 20, 2012
Stanford’s Knight Management Center Awarded LEED Platinum
The 360,000-sf facility underscores what is taught in many of the school’s electives such as Environmental Entrepreneurship and Environmental Science for Managers and Policy Makers, as well as in core classes covering sustainability across the functions of business.
| Mar 19, 2012
HKS Selected for Baylor Medical Center at Waxahachie
Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records.
| Mar 14, 2012
Tsoi/Kobus and Centerbrook to design Jackson Laboratory facility in Farmington, Conn.
Building will house research into personalized, gene-based cancer screening and treatment.
| Mar 6, 2012
EwingCole completes first design-build project for the USMA
The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.
| Mar 6, 2012
Joliet Junior College achieves LEED Gold
With construction managed by Gilbane Building Company, Joliet Junior College’s Facility Services Building combines high-performance technologies with sustainable materials to meet aggressive energy efficiency goals.
| Mar 1, 2012
Cornell shortlists six architectural firms for first building on tech campus
Each of the firms will be asked to assemble a team of consultants and prepare for an interview to discuss their team’s capabilities to successfully design the university’s project.
| Mar 1, 2012
Bomel completes design-build parking complex at U.C. San Diego
The $24-million facility, which fits into a canyon setting on the university’s East Campus, includes 1,200 stalls in two adjoining garages and a soccer field on a top level.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.
| Feb 14, 2012
Angelo State University opens doors to new recreation center expansion
Designed by SmithGroup, the JJR_Center for Human Performance offers enhanced fitness options, dynamic gathering space.