The Paint Factory reimagines Little Rock’s oldest remaining industrial complex as a neighborhood called East Village, a mixed-use redevelopment of a factory that now includes a restaurant (Catshead Diner), apartments (12 Star Flats), a community space (The Mixing Room), and a new HQ for the project’s designer.
Formerly the Stebbins and Roberts building, built in 1947, it housed Sterling Paint until the early 2000s. The reconstruction retained many original building features, including exposed concrete structural columns and board-formed concrete. Original steel windows were repaired and repainted, masonry cleaned, and large openings filled with matching brick.
The project team invested heavily in infrastructure improvements to reduce localized flooding that effectively cut off neighborhoods and businesses around East Village from the rest of the city during heavy rain events.
The project is pursuing LEED Platinum certification. Among its sustainable design: the state’s first solar skylights and pollution-reducing roof. New skylights were cut through the roof and second floor to light the central collaboration zone in the main studio. The air and data systems are distributed under raised flooring so that the board-formed concrete slab above the studio would not be obscured.
When the building was under construction, there were no codes for seismic force resistance and protection, and best practices were deemed too expensive. The project team’s solution was to position new shear walls at strategic locations and tie back some steel members to the existing structure to improve resistance capacity.
Cromwell Architects Engineers, which purchased the building in 2015, is known for its community advocacy. The firm has been working with its partners to give East Village an identity that sets the tone for future growth. Since the development of The Paint Factory, $75 million worth of new construction has flowed into the area.
GOLD AWARD WINNER
BUILDING TEAM Cromwell Architects Engineers (submitting firm, owner, architect, SE, MEP) Newman Moses Tucker Partners (developer) Central Construction Group (GC) DETAILS 50,000 sf Total cost $7.9 million Construction time October 2016 to March 2018 Delivery method CM at risk
Related Stories
Reconstruction Awards | Dec 1, 2017
Rescue mission: Historic movie palace is now the centerpiece of Baltimore’s burgeoning arts hub
In restoring the theater, the design team employed what it calls a “rescued ruin” preservation approach.
Reconstruction Awards | Dec 1, 2017
Gothic revival: The nation’s first residential college is meticulously restored
This project involved the renovation and restoration of the 57,000-sf hall, and the construction of a 4,200-sf addition.
Reconstruction Awards | Dec 1, 2017
Rockefeller remake: Iconic New York tower is modernized for its next life
To make way for new ground-floor retail and a more dramatic entrance and lobby, the team removed four columns at the ground floor.
Reconstruction Awards | Nov 30, 2017
BD+C's 2017 Reconstruction Award Winners
Provo City Center Temple, the Union Trust Building, and the General Motors Factory One are just a few of the projects recognized as 2017 Reconstruction Award winners.
Reconstruction Awards | Nov 29, 2017
College credit: Historic rehab saves 50% on energy costs
The project team conducted surveys of students, faculty, and staff to get their input.
Reconstruction Awards | Nov 29, 2017
Amazing grace: Renovation turns a church into elegant condos
The windows became The Sanctuary’s chief sales edge.
Reconstruction Awards | Nov 28, 2017
Broadway melody: Glass walls set just the right tone for a historic lobby in Lower Manhattan
The adaptation of the 45,000-sf neoclassical lobby at 195 Broadway created three retail spaces and a public walkway.
Reconstruction Awards | Nov 27, 2017
Higher education: The rebirth of a Washington, D.C., high school
The project team, led by architect Perkins Eastman, restored the original cupola.
Reconstruction Awards | Nov 27, 2017
Bank statement: A project team saves a historic bank, yielding 100% leaseup for the developer
The project team had to fix poor renovations made in the ’50s.
Reconstruction Awards | Nov 27, 2017
Patient friendly: The University of Chicago Medicine Center for Care and Discovery adds 203 new beds
Strict infection control and life safety measures were implemented to protect patients on other floors as work proceeded.