Gilbane Building Company and Albert Kahn Associates completed the 204,000-sf buildout of two vacant floors at The University of Chicago Medicine Center for Care and Discovery, adding 203 new beds. Through the use of six-week, look-ahead planning, adherence to Lean construction principles, Gilbane’s own Quality in Construction program, and prefabrication (for headwalls, dialysis boxes, soffits, and ductwork and plumbing assemblies), the team was able to bring the job in two months ahead of schedule.
The trades used on-site monitors to access documents via Bluebeam Studio. UPC coding and BIM 360 also greased the flow of documents. Mockups of various rooms (med-surg, isolation, observation, ICU) gave medical staff the opportunity to offer input on headwall layouts, tile colors, soffit details, and flooring types.
Existing critical exhaust hoods in 24/7 support spaces were found to be inadequately sized for anticipated airflow. One option—to change the motors and sheaves on the exhaust fans—was ruled out as too disruptive to the operations of clinical departments. Instead, the team incorporated readily obtainable new fans into the existing exhaust system so that the original fans could be removed and modified. The solution saved the hospital considerable operational impacts.
Strict infection control risk assessment (ICRA) and interim life safety measures were put in place to meet the demands of eight separate hospital departments. Halfway through the project, the hospital required that all differential pressure monitors have remote monitoring capability. Gilbane engaged Primex Wireless, which tied a web-based reporting system into the hospital’s existing wireless network. This assured that any possible ICRA breach would be addressed instantaneously.
Union construction crews put in 460,000 man-hours on the buildout of two patient floors at the University of Chicago Medicine Center for Care and Discovery without a lost-time incident. Nearly half (48%) of all trades workers were minorities, females, or both. Photo: Jon Miller / Hedrich Blessing Photographers.
Project Summary
Silver Award Winner
Building Team: Gilbane Building Company (submitting firm CM) Albert Kahn Associates (architect, SE, M/E engineer).
Details: 204,000 sf. Total cost: $98.3 million. Construction time: February 2015 to August 2016. Delivery method CM at risk.
See all of the 2017 Reconstruction Award winners here
Related Stories
Reconstruction Awards | Nov 11, 2016
Exclusive Chicago club re-emerges as a boutique hotel
Built in 1893 for the World’s Columbian Exposition, the CAA was an exclusive social club founded by leading figures in American sports and commerce.
Reconstruction Awards | Dec 1, 2015
Massive Chicago parking garage gets overdue waterproofing
Millennium Lakeside Garage, the largest underground parking facility in the U.S., hadn’t been waterproofed since the 1970s. The massive project took nearly 2½ years and 33,554 man-hours.
Reconstruction Awards | Nov 30, 2015
Washington Monument restored after 2011 East Coast earthquake
This restoration and repair project, which was completed under budget and eight days early (despite several setbacks), involved re-pointing 2.5 miles of mortar joints, repairing 1,200 linear feet of cracks, and installing 150 sf of Dutchman repairs. Construction took place from November 2011 to May 2014.
Reconstruction Awards | Nov 30, 2015
Denver's 107-year-old seminary campus modernized
The scope of the project included the seminary dorms, library, and chapel, all of which posed their own set of obstacles.
Reconstruction Awards | Nov 24, 2015
Center of I.M. Pei-designed plaza part of Washington redevelopment
The L’Enfant Plaza, a three-story below-grade mall, was renovated to include a new glass atrium pavilion and a 40-foot-long, interactive LED.
Reconstruction Awards | Nov 24, 2015
Manhattan's first freestanding emergency department a result of adaptive reuse
The Lenox Hill Healthplex, a restoration of the Curran O’Toole Building, has glass-block walls and a carefully preserved exterior.
Reconstruction Awards | Nov 19, 2015
Nave restored at Yale’s Sterling Memorial Library
Turner Construction and Helpern Architects revived the 150-foot-long nave, which was embellished with stained glass windows by G. Owen Bonawit, stone carvings by René P. Chambellan, and decorative ironwork by Samuel Yellin.
Reconstruction Awards | Nov 19, 2015
Infinite Chicago redevelopment bridges past to present
The renovation of three historic downtown buildings—the Gibbons and Steger Buildings and Pickwick Stables—includes a multi-level concrete walkway connection.
Reconstruction Awards | Nov 18, 2015
Sun Theater serves the youth of St. Louis
Lawrence Group and property owner TLG Beaux Arts raised $11 million to restore the 26,000-sf theater into a modern performance venue.
Reconstruction Awards | Nov 17, 2015
Smithsonian Institution’s Arts and Industries Building again an exposition and museum space
After removing decades’ worth of unfortunate additions to expose 17 historic interior spaces for the National Historic Landmark, the Building Team zoned in on the client’s key concern.