flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

PC Construction completes Juniper Hall at Champlain College

PC Construction completes Juniper Hall at Champlain College

Juniper Hall is on track for LEED Gold certification from the U.S. Green Building Council.


By Posted by Tim Gregorski, Senior Editor | November 20, 2012
Exterior features include brick, stone and flat-seam metal panels, a slate-shing
Exterior features include brick, stone and flat-seam metal panels, a slate-shingled roof and stone walls with granite accents.

PC Construction recently completed construction of Champlain’s Juniper Hall. The $7.7 million, 29,200 square foot, 95-bed residential hall is located in the center of the hillside campus. Exterior features include brick, stone and flat-seam metal panels, a slate-shingled roof and stone walls with granite accents.

Nestled in the four-story residence are features including a stone entrance and fireplace, wood floors, student lounges and a large gathering space, a ski-tuning room, laundry facilities, a full kitchen, television viewing area, and large windows featuring stunning views of Lake Champlain.

At Champlain College, environmental stewardship and sustainability are also critically important.

Recognized by the Princeton Review as one of 322 Green Colleges, Champlain College’s Juniper Hall is on track for LEED Gold certification from the U.S. Green Building Council. In a Princeton Review survey of more than 7,400 college applicants, 68 percent said that a college’s commitment to the environment would have an impact on their decision to apply to or attend the school. Specific criteria included having a healthy and sustainable quality-of-life on campus, how well the school prepares students for employment and citizenship in a world defined by environmental challenges, and the school’s overall commitment to sustainability issues.

Champlain College and PC Construction are scheduled to break ground on two other residential halls in the spring of 2013. +

Related Stories

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

| Aug 11, 2010

Great Solutions: Collaboration

9. HOK Takes Videoconferencing to A New Level with its Advanced Collaboration Rooms To help foster collaboration among its 2,212 employees while cutting travel time, expenses, and carbon emissions traveling between its 24 office locations, HOK is fitting out its major offices with prototype videoconferencing rooms that are like no other in the U.

| Aug 11, 2010

2009 Judging Panel

A Matthew H. Johnson, PE Associate Principal Simpson Gumpertz & HegerWaltham, Mass. B K. Nam Shiu, SE, PEVP Walker Restoration Consultants Elgin, Ill. C David P. Callan, PE, CEM, LEED APSVPEnvironmental Systems DesignChicago D Ken Osmun, PA, DBIA, LEED AP Group President, ConstructionWight & Company Darien, Ill.

| Aug 11, 2010

Inspiring Offices: Office Design That Drives Creativity

Office design has always been linked to productivity—how many workers can be reasonably squeezed into a given space—but why isn’t it more frequently linked to creativity? “In general, I don’t think enough people link the design of space to business outcome,” says Janice Linster, partner with the Minneapolis design firm Studio Hive.

| Aug 11, 2010

BIM school, green school: California's newest high-performance school

Nestled deep in the Napa Valley, the city of American Canyon is one of a number of new communities in Northern California that have experienced tremendous growth in the last five years. Located 42 miles northeast of San Francisco, American Canyon had a population of just over 9,000 in 2000; by 2008, that figure stood at 15,276, with 28% of the population under age 18.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021