PC Construction is promoting Kevin McCarthy to president and chief executive officer, effective April 1, 2013 when Peter Bernhardt steps away from the day-to-day leadership of the company.
McCarthy, who joined PC Construction in 1998 and currently serves as executive vice president, will become a member of the employee-owned company’s board of directors and a trustee of the employee stock ownership plan.
McCarthy joined PC Construction as vice president with more than 17 years of estimating, project management and executive oversight experience in the construction industry. Throughout his time with PC Construction, he has provided leadership for various areas of the company’s construction operations in addition to estimating, strategic planning, and managing safety and various operations support services. His role evolved to senior vice president in 2007 before his promotion to executive vice president in 2011.
With this transition, Peter Bernhardt will move away from the career he built with PC Construction over the past 37 years and take on the role of chairman of the company, succeeding Jim Pizzagalli, who will remain a director. While Bernhardt will no longer be involved with daily company operations, he will continue to be a PC Construction employee-owner and work on a part-time basis dedicated to serving McCarthy and the board of directors. +
Related Stories
| Apr 10, 2013
6 funding sources for charter school construction
Competition for grants, loans, and bond financing among charter schools is heating up, so make your clients aware of these potential sources.
| Apr 9, 2013
FMI predicts 8% rise in construction put in place for 2013
FMI, the largest provider of management consulting and investment banking services to the engineering and construction industry released today its Q1-2013 Construction Outlook. The forecast for total construction-put-in-place for 2013 continues to show an increase of 8% over 2012 levels.
| Apr 8, 2013
Most daylight harvesting schemes fall short of performance goals, says study
Analysis of daylighting control systems in 20 office and public spaces shows that while the automatic daylighting harvesting schemes are helping to reduce lighting energy, most are not achieving optimal performance, according to a new study by the Energy Center of Wisconsin.
| Apr 6, 2013
First look: GlaxoSmithKline's double LEED Platinum office
GlaxoSmithKline and Liberty Property Trust/Synterra Partners transform the work environment with the opening of Five Crescent Drive
| Apr 5, 2013
‘Retainage Laws in the 50 States’ manual from ASA available for subcontractors
A reference manual published by the American Subcontractors Association, Retainage Law in the 50 States, is available for construction subcontractors to understand retainage laws across the U.S.
| Apr 5, 2013
Bangkok gets a leaning tower, that may topple
A seven-story apartment tower under construction in Bangkok has started to tilt and is on the verge of toppling.
| Apr 5, 2013
Snøhetta design creates groundbreaking high-tech library for NCSU
The new Hunt Library at North Carolina State University, Raleigh, incorporates advanced building features, including a five-story robotic bookBot automatic retrieval system that holds 2 million volumes in reduced space.