J. David (Dave) Pepper, 59, passed away unexpectedly but peacefully on Saturday, December 28, 2019 at his home in Barrington, Illinois. He was born in Evanston on January 15, 1960 to Richard and Roxelyn Pepper. He was a civil engineering graduate of Iowa State University, where he met his wife, Katy. Dave served as CEO of Pepper Construction Group and lived his life in service to others and was widely known for his kindness and generosity.
Dave's life centered around his family and friends. He enjoyed cooking, boating and travelling and frequently said that being part of his family was the best leadership lesson of his life. He believed that values shape lives, particularly through unexpected turns, and Dave instilled honesty, gratitude and openness into the culture of Pepper Construction, which he led from 2003.
Dave was known as a champion of education and held multiple leadership roles including president of the Associated General Contractors (AGC) Education and Research Foundation, a nonprofit charitable organization dedicated to improving the science of construction. Dave was also involved in workforce readiness and school mentoring programs. Most recently, Dave served on the Providence St. Mel School Board of Trustees; the Dominican University Board of Trustees; Junior Achievement of Chicago's Board of Directors and Executive Committee; and served as a Management Trustee to the Chicago Regional Council of Carpenters and supported their educational programs over several decades.
Dave also actively served the community as a member at St. Michael’s Episcopal church and was a member of the Economic Club of Chicago; The Chicago Club; the Max McGraw Wildlife Foundation and The Commercial Club of Chicago. Dave leaves behind his loving wife Katy and their three children, Ali, Lauren and Colin; as well as his parents, Richard and Roxelyn Pepper; brothers, Dick, Stan, Scot; and sisters, Lisa and Lynda; and numerous nieces, nephews and cousins.
A memorial visitation will be held Friday, January 3, from 4:00 – 8:00 p.m. at St. Michael’s Episcopal Church located at 647 Dundee Avenue in Barrington. The memorial service will be at 10:00 a.m. on Saturday, January 4 at the church. Additional parking will be available across the street at St. Matthew Lutheran Church located at 720 Dundee Avenue.
In lieu of flowers, donations in Dave's memory can be made to Bishop Anderson House at https://www.bishopandersonhouse.org/donate/ and St. Michael's Youth Program at 847-381-2323 or info@stmichaelsbarrington.org. For more information, or to sign the guestbook please visit https://www.davenportfamily.com/notices/JamesDave-Pepper.
Related Stories
| Jan 18, 2012
ABI positive for second straight month
All regions except for the West showing improved demand for design services.
| Jan 17, 2012
SOM Chicago wins competition to design China's Suzhou Center
The 75-level building is designed to accommodate a complex mixed-use program including office, service apartments, hotel and retail on a 37,000 sm site.
| Jan 17, 2012
FxFowle and CO Architects form joint venture
FxFowle and CO Architects creates a dynamic alliance built on a shared dedication to collaboration in process, innovation in programming, and excellence in design.
| Jan 17, 2012
Capital Engineering joins AECOM
With 160 employees based in Taipei and Kaohsiung, CEC specializes in environmental, water, hydraulic and land development engineering consulting services for clients in Taiwan's public and private sectors.
| Jan 17, 2012
SOM launches Los Angeles design studio
Expert team to join the firm's West Coast practice, focusing on innovative urban and environmentally sustainable design in Southern California
| Jan 16, 2012
2012 40 Under 40 applications due Friday, Jan. 20
Building Design+Construction's 40 Under 40 is open to AEC professionals from around the world who are under 40 years old, as of January 1, 2012.
| Jan 16, 2012
Mid-Continent Tower wins 25 Year Award from AIA Eastern Oklahoma
Designed by Dewberry, iconic tower defines Tulsa’s skyline.
| Jan 16, 2012
Suffolk completes construction on progressive operating suite
5,700 square-foot operating suite to be test bed for next generation of imaged-guided operating techniques.
| Jan 15, 2012
Hollister Construction Services oversees interior office fit-out for Harding Loevner
The work includes constructing open space areas, new conference, trading and training rooms, along with multiple kitchenettes.
| Jan 15, 2012
Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.
The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.