J. David (Dave) Pepper, 59, passed away unexpectedly but peacefully on Saturday, December 28, 2019 at his home in Barrington, Illinois. He was born in Evanston on January 15, 1960 to Richard and Roxelyn Pepper. He was a civil engineering graduate of Iowa State University, where he met his wife, Katy. Dave served as CEO of Pepper Construction Group and lived his life in service to others and was widely known for his kindness and generosity.
Dave's life centered around his family and friends. He enjoyed cooking, boating and travelling and frequently said that being part of his family was the best leadership lesson of his life. He believed that values shape lives, particularly through unexpected turns, and Dave instilled honesty, gratitude and openness into the culture of Pepper Construction, which he led from 2003.
Dave was known as a champion of education and held multiple leadership roles including president of the Associated General Contractors (AGC) Education and Research Foundation, a nonprofit charitable organization dedicated to improving the science of construction. Dave was also involved in workforce readiness and school mentoring programs. Most recently, Dave served on the Providence St. Mel School Board of Trustees; the Dominican University Board of Trustees; Junior Achievement of Chicago's Board of Directors and Executive Committee; and served as a Management Trustee to the Chicago Regional Council of Carpenters and supported their educational programs over several decades.
Dave also actively served the community as a member at St. Michael’s Episcopal church and was a member of the Economic Club of Chicago; The Chicago Club; the Max McGraw Wildlife Foundation and The Commercial Club of Chicago. Dave leaves behind his loving wife Katy and their three children, Ali, Lauren and Colin; as well as his parents, Richard and Roxelyn Pepper; brothers, Dick, Stan, Scot; and sisters, Lisa and Lynda; and numerous nieces, nephews and cousins.
A memorial visitation will be held Friday, January 3, from 4:00 – 8:00 p.m. at St. Michael’s Episcopal Church located at 647 Dundee Avenue in Barrington. The memorial service will be at 10:00 a.m. on Saturday, January 4 at the church. Additional parking will be available across the street at St. Matthew Lutheran Church located at 720 Dundee Avenue.
In lieu of flowers, donations in Dave's memory can be made to Bishop Anderson House at https://www.bishopandersonhouse.org/donate/ and St. Michael's Youth Program at 847-381-2323 or info@stmichaelsbarrington.org. For more information, or to sign the guestbook please visit https://www.davenportfamily.com/notices/JamesDave-Pepper.
Related Stories
| Apr 13, 2011
Office interaction was the critical element to Boston buildout
Margulies Perruzzi Architects, Boston, designed the new 11,460-sf offices for consultant Interaction Associates and its nonprofit sister organization, The Interaction Institute for Social Change, inside an old warehouse near Boston’s Seaport Center.
| Apr 13, 2011
Expanded Museum of the Moving Image provides a treat for the eyes
The expansion and renovation of the Museum of the Moving Image in the Astoria section of Queens, N.Y., involved a complete redesign of its first floor and the construction of a three-story 47,000-sf addition.
| Apr 13, 2011
Duke University parking garage driven to LEED certification
People parking their cars inside the new Research Drive garage at Duke University are making history—they’re utilizing the country’s first freestanding LEED-certified parking structure.
| Apr 13, 2011
Red Bull Canada HQ a mix of fluid spaces and high-energy design
The Toronto architecture firm Johnson Chou likes to put a twist on its pared-down interiors, and its work on the headquarters for Red Bull Canada is no exception. The energy drink maker occupies 12,300 sf on the top two floors of a three-story industrial building in Toronto, and the design strategy for its space called for leaving the base building virtually untouched while attention was turned to the interior architecture.
| Apr 13, 2011
Former department store gets new lease on life as MaineHealth HQ
The long-vacant Sears Roebuck building in Portland, Maine, was redeveloped into the corporate headquarters for MaineHealth. Consigli Construction and local firm Harriman Architects + Engineers handled the 14-month fast-track project, transforming the 89,000-sf, four-story facility for just $100/sf.
| Apr 12, 2011
Rutgers students offered choice of food and dining facilities
The Livingston Dining Commons at Rutgers University’s Livingston Campus in New Brunswick, N.J., was designed by Biber Partnership, Summit, N.J., to offer three different dining rooms that connect to a central servery.
| Apr 12, 2011
Retail complex enjoys prime Abu Dhabi location
The Galleria at Sowwah Square in Abu Dhabi will be built in a prime location within Sowwah Island that also includes a five-star Four Seasons Hotel, the healthcare facility Cleveland Clinic Abu Dhabi, and nearly two million sf of Class A office space.
| Apr 12, 2011
Luxury New York high rise adjacent to the High Line
Located adjacent to New York City’s High Line Park, 500 West 23rd Street will offer 111 luxury rental apartments when it opens later this year.
| Apr 12, 2011
College of New Jersey facility will teach teachers how to teach
The College of New Jersey broke ground on its 79,000-sf School of Education building in Ewing, N.J.
| Apr 12, 2011
Mental hospital in Boston redeveloped as healthcare complex
An abandoned state mental health facility in Boston’s prestigious Longwood Medical Area is being transformed into the Mass Mental Health Center, a four-building mixed-use complex that includes a mental health day hospital, a clinical and office building, a medical research facility for Brigham and Women’s Hospital, and a residential facility.