flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Perkins and Will tests a turnkey laboratory for S+T startups moving up from their incubation phase

Giants 400

Perkins and Will tests a turnkey laboratory for S+T startups moving up from their incubation phase

The design giant has identified one critical need among S+T startups that want to graduate from their incubator stage: “step-out” labs.


By John Caulfield, Senior Editor | August 13, 2019
Hudson Research Center, Manhattan, Taconic Development, HiberCell, architect Perkins+Will

Perkins and Will’s turnkey lab, specifically for companies ready to break out of their incubator state, is currently being tested at the Hudson Research Center in Manhattan, managed by Taconic Development, where HiberCell has taken 15,000 sf of lab space designed to the firm’s specifications. Rendering courtesy Taconic Development 

   

New York City is trying to attract more biotech through its 10-year, $500 million LifeSci NYC Initiative, whose focus includes providing financial support for life sciences campuses, nonprofit R&D facilities, commercial lab space, and incubator expansion.

Perkins and Will has identified one critical need among startups that want to graduate from their incubator stage: “step-out” labs that are flexible enough to expand along with these new companies.

Matthew Malone, a Science and Technology Practice Leader at Perkins and Will’s New York office, explains that when startups come out of incubation, they are often leasing space on a lineal-foot basis, which limits their growth and the amount of time they can spend in that space. In addition, he explains, the startups’ funding is usually earmarked toward science, not rent, and the companies’ leadership isn’t always business savvy.

Working with Taconic Development, a real estate development and property management firm, Perkins and Will has devised a spec lab, which is entirely turnkey to meet the tenants’ evolving needs. This step-out lab would range from 7,000 to 12,000 sf, and would lease from $60 to $100 per sf, although that would vary up or down depending on location.

 

HiberCell gets first step-out labortaory  

Perkins and Will has already tried this concept in Cambridge, Mass. Its first step-out lab in New York will be a 15,000-sf space that HiberCell, a company focused exclusively on therapeutically modulating the biology and mechanisms of tumor dormancy, is leasing on the 8th floor of the Hudson Research Center in Midtown Manhattan. 

Taconic owned this 320,000-sf building from 2012 through 2017, and still manages the property for its current owner Silverstein Properties. The rebranded Hudson Research Center is leasing 150,000 sf to S+T tenants, the first of which was the Stem Cell Foundation, which took 42,000 sf in 2017. 

 

SEE ALSO: Top 65 Science and Technology Sector Architecture Firms
SEE ALSO: Top 55 Science and Technology Sector Engineering Firms
SEE ALSO: Top 40 Science and Technology Sector Construction Firms

 

HiberCell (which has raised nearly $61 million) moved in on May 1 and is paying $80 per sf in rent, plus operating expenses, says Matthew Weir, a SVP with Taconic. Perkins and Will was the architect for this fitout, BR+A the design engineer, and Talisen Construction the GC. The space is fit for 50 employees, says Malone.

Weir says he “loves the demand drivers” behind S+T turnkey solutions, noting that labs in New York City are No. 2 in the country for receiving funding from the National Institutes of Health.

He notes, however, that the trick to making turnkey labs worth the expense is to make them adaptable and flexible enough “to accommodate a biology-oriented tenant, a chemistry-oriented tenant, and so forth, so we can make changes at minimal cost to the owner.”

Weir says that Taconic would like to try this concept in some of its other buildings, which would require addressing zoning issues, the building envelope, “and how to get the infrastructure into the space.”

Tags

Related Stories

Giants 400 | Aug 11, 2021

BD+C Awards Programs

Entry information and past winners for Building Design+Construction's two major awards programs: 40 Under 40 and Giants 400

University Buildings | Aug 6, 2021

Is air quality the next hot campus amenity?

New research shows that students want to be back on campus, but they—and their parents—are asking more of higher ed institutions.

Giants 400 | Dec 16, 2020

Download a PDF of all 2020 Giants 400 Rankings

This 70-page PDF features AEC firm rankings across 51 building sectors, disciplines, and specialty services.

Giants 400 | Dec 3, 2020

2020 Science & Technology Facilities Giants: Top architecture, engineering, and construction firms in the S+T sector

HDR, Jacobs, and Turner head BD+C's rankings of the nation's largest science and technology (S+T) facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Giants 400 | Dec 3, 2020

2020 Laboratory Facilities Sector Giants: Top architecture, engineering, and construction firms in the U.S. laboratory facilities sector

Affiliated Engineers, HDR, and Skanska top BD+C's rankings of the nation's largest laboratory facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Giants 400 | Dec 3, 2020

2020 Industrial Sector Giants: Top architecture, engineering, and construction firms in the U.S. industrial buildings sector

Clayco, Jacobs, and Ware Malcomb top BD+C's rankings of the nation's largest industrial buildings sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Giants 400 | Dec 3, 2020

2020 Convention Center Sector Giants: Top architecture, engineering, and construction firms in the U.S. convention center sector

AECOM, Gensler, and Jacobs head BD+C's rankings of the nation's largest convention center sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Giants 400 | Dec 3, 2020

2020 Reconstruction Sector Giants: Top architecture, engineering, and construction firms in the U.S. building reconstruction and renovation sector

Gensler, Jacobs, and STO Building Group head BD+C's rankings of the nation's largest reconstruction sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Giants 400 | Dec 3, 2020

2020 K-12 School Sector Giants: Top architecture, engineering, and construction firms in the U.S. K-12 school facilities sector

AECOM, Gilbane, and PBK head BD+C's rankings of the nation's largest K-12 school facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

Giants 400 | Dec 3, 2020

2020 Sports Facilities Sector Giants: Top architecture, engineering, and construction firms in the U.S. sports facilities sector

Kimley-Horn, Mortenson, and Populous top BD+C's rankings of the nation's largest sports facilities sector architecture, engineering, and construction firms, as reported in the 2020 Giants 400 Report.

boombox1
boombox2
native1

More In Category




Giants 400

Call for surveys: 2024 Giants 400 Report

Building Design+Construction's annual Giants 400 Report ranks the nation's top architecture, architecture/engineering (AE), engineering/architecture (EA), general contractors, and fee-based construction management (CM) firms, by revenue. You’ll want to be sure your firm is on the Giants 400 lists, as potential clients look to these rankings for prospective firms to design and construct their future projects.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021