flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Peter Rutti named Director of Design of Westlake Reed Leskosky’s Phoenix studio

Peter Rutti named Director of Design of Westlake Reed Leskosky’s Phoenix studio

Rutti’s current work includes the design of the renovation and expansion of the Avalon Theater of Grand Junction, Colo.


By Westlake Reed Leskosky | February 14, 2013
Peter W. Rutti, AIA, Associate Principal and Project Director of Westlake Reed L
Peter W. Rutti, AIA, Associate Principal and Project Director of Westlake Reed Leskosky

Peter W. Rutti, AIA, Associate Principal and Project Director of Westlake Reed Leskosky, has been appointed Director of Design of the Phoenix, Arizona studio of the nationally recognized architects, engineers, and technology designers.  The announcement recognizes the design excellence, leadership, and continued growth of the national and international practice of the integrated design firm in the western region.

According to managing principal Paul E. Westlake, Jr., FAIA, “Peter Rutti is a formidable designer and a premier resource, with a specialty in cultural arts.   He brings his western roots and background in California and Phoenix to take a leading role on the national, and now international, stage.  As Director of Design of the Phoenix studio, along with his contributions in the academic framework, he advances design excellence and inspires future leaders as well.”

As Director of Design of Westlake Reed Leskosky’s Phoenix studio, Peter Rutti brings his design approach focusing on fostering collaboration, listening to client needs, assessing project programs, giving design form, and delivering inspiring solutions. Over the last decade he has been asked to help lead and coordinate design teams for some of the most complex and high profile performing arts centers in the United States, understanding not only how to build cultural arts facilities, but more importantly, what makes them resonate with audiences and communities.

Architect Rutti says, “Through my experience on performing art centers in particular, I truly believe the success of architecture can only be achieved through a constant personal involvement on the project - from beginning to end.  Only in that way that user needs and theatrical requirements can be synthesized into distinctive architecture.”

Mr. Rutti’s current work includes the design of the renovation and expansion of the Avalon Theater of Grand Junction, Colorado, transforming the 1923 historic Vaudeville playhouse into a vibrant multi-venue regional center for the arts as a new anchor for downtown redevelopment and social engagement.  He is also designing cultural arts projects of Westlake Reed Leskosky in Beijing and Shanghai, China, and Taiwan.

Mr. Rutti has traveled widely throughout Western and Eastern Europe studying theatres, churches and civic spaces, and first apprenticed as an architect in Prague during the 1990s. He brings to all of his projects a careful understanding of how to finesse complex programs into elegantly designed and carefully detailed buildings.   As a result, his work has been widely published in national design journals and nationally cited in design programs including those of the American Institute of Architects.

Mr. Rutti extends his commitment to design excellence through his involvements in the development of the architectural community. He is an Adjunct Professor at the Arizona State University School of Architecture & Landscape Architecture where he currently teaches a graduate level Comprehensive Design Studio focusing on the design of Performing Art Centers.  Peter is also a visiting critic at the UCLA School of Architecture & Urban Design and School of Architecture & Landscape Architecture at the University of Arizona.

A member of the American Institute of Architects and Contemporary Forum of Phoenix Art Museum, Mr. Rutti received his Master of Architecture from the University of California Los Angeles, 2001 and his Bachelor of Architecture from the University of Arizona, 1995, and completed a Semester Audit/Study of Urban Architecture at Southern California Institute of Architecture, in 1993.

About Westlake Reed Leskosky
Widely published and recognized for design excellence, Westlake Reed Leskosky (www.WRLdesign.com) has been cited with over 300 design awards in the past ten years. Celebrating its 109th year of continuous operation in the United States, and founded by Abram Garfield, son of President James A. Garfield, the firm has offices in Phoenix, Cleveland, Washington DC, New York, and Los Angeles, CA.

Westlake Reed Leskosky bases success and growth on integrated and comprehensive building design services with building specialization in cultural, civic, healthcare, work place environments, and educational facilities.  This expertise is delivered using Building Information Modeling with highly integrated specialized capabilities including LEED/sustainable design, interior design, structural, mechanical, electrical and plumbing engineering, data transport/IT and technology design, security design, theatre technical services, audio-visual and lighting services, assistance in historic and new markets tax credits, and cultural arts planning.   

Westlake Reed Leskosky is listed among the country’s top design firms, including ranking in AIA’s Architect magazine’s 2012 Top 50 as #6 Overall based on business, sustainability, and design excellence/pro bono and  #1 in Sustainability, and among the 2012 “Top 100 Green Design Firms in the U.S.” by Engineering News-Record.

Westlake Reed Leskosky is in its third decade of practice in Arizona, commencing with its commission to restore the Orpheum Theatre in Phoenix, and establishing its permanent office in the city in 1997.  In the past 16 years, the studio has developed a portfolio of significant projects in the southwest that represents each of the firm’s specialties. The office is presently working on an amphitheatre in Shanghai, an amphitheatre and multi-purpose theatre in Beijing, two multi-purpose theatres in Taiwan, and an event center in Gabon, Africa.

Tags

Related Stories

Multifamily Housing | Apr 20, 2022

A Frankfurt tower gives residents greenery-framed views

In Frankfurt, Germany, the 27-floor EDEN tower boasts an exterior “living wall system”: 186,000 plants that cover about 20 percent of the building’s facade.

AEC Tech | Apr 19, 2022

VDC maturity and the key to driving better, more predictable outcomes

While more stakeholders across the AEC value chain embrace the concept of virtual design and construction, what is driving the vastly different results that organizations achieve? The answer lies within an assessment of VDC maturity.

Healthcare Facilities | Apr 19, 2022

6 trends to watch in healthcare design

As the healthcare landscape continues to evolve, IMEG’s healthcare leaders from across the country are seeing several emerging trends that are poised to have wide-ranging impacts on facility design and construction. Following are six of the trends and strategies they expect to become more commonplace in 2022 and the years to come. 

Energy-Efficient Design | Apr 19, 2022

A prefab second skin can make old apartments net zero

A German startup is offering a new way for old buildings to potentially reach net-zero status: adding a prefabricated second skin.

Concrete Technology | Apr 19, 2022

SGH’s Applied Science & Research Center achieves ISO 17025 accreditation for concrete testing procedures

Simpson Gumpertz & Heger’s (SGH) Applied Science & Research Center recently received ISO/IEC17025 accreditation from the American Association for Laboratory Accreditation (A2LA) for several concrete testing methods.

Senior Living Design | Apr 19, 2022

Affordable housing for L.A. veterans and low-income seniors built on former parking lot site

The Howard and Irene Levine Senior Community, designed by KFA Architecture for Mercy Housing of California, provides badly needed housing for Los Angeles veterans and low-income seniors

Sponsored | BD+C University Course | Apr 19, 2022

Multi-story building systems and selection criteria

This course outlines the attributes, functions, benefits, limits, and acoustic qualities of composite deck slabs. It reviews the three primary types of composite systems that represent the full range of long-span composite floor systems and examines the criteria for their selection, design, and engineering.

Building Team | Apr 18, 2022

Shive-Hattery Acquires WSM Architects

Shive-Hattery announces that it has acquired WSM Architects, Inc., a 13-person architecture firm in Tucson, Arizona. 

University Buildings | Apr 18, 2022

SmithGroup to design new Univ. of Colorado Denver engineering, design, computing building

The University of Colorado Denver selected SmithGroup to design a new engineering, design, and computing building that will serve as anchor of new downtown innovation district.

Building Team | Apr 15, 2022

Frank Gehry to design his largest building yet for his hometown of Toronto

Famed architect Frank Gehry will design his largest building to date for his hometown of Toronto, Canada.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021