flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

PGAL acquires Dallas-based Pro Forma Architecture

Architects

PGAL acquires Dallas-based Pro Forma Architecture

The merger adds a firm that has specialized in municipal projects.


By John Caulfield, Senior Editor | March 16, 2016

The fire station in Allen, Texas, which opened in 2012, is a prime example of Pro Forma's expertise in designing municipal buildings. Image: Courtesy of PGAL

Pro Forma Architecture, a 17-year-old Dallas-based firm, has merged with PGAL, an international architectural and engineering firm based in Houston and operating nine other offices in the U.S. and one in Mexico City.

Founded in 1946, PGAL employs more than 200 architects, planners, engineers, and designers. It has a wide-ranging portfolio in office, transportation, hospitality, education, healthcare, recreation, and government. (PGAL just got the okay from the city council at College Station, Texas, for a $1.96 million contract to design a new police station that will sit on 12 acres of city-owned property.)

Pro Forma specializes in designing municipal projects like libraries, senior centers, and fire and police stations. Through this merger, PGAL will expand Pro Forma’s expertise for its growing client list in Texas’s north and central regions.

“Now, there’s no projects we can’t pursue.”

– Jeff Bulla, Co-founder of Pro Forma

Jeff Bulla, AIA, LEED AP BD+C, Pro Forma’s co-founder, is staying on as Principal at PGAL’s Dallas office. He and his company’s four employees moved into PGAL’s office in January.

The 54-year-old Bulla tells BD+C that he began to question Pro Forma’s ability to compete as an independent firm in North Texas when the last recession was raging in 2008-2009. “The big firms started fishing in my pond and going after everything in sight,” he recalls. That made it harder for Pro Forma to get projects and offer competitive packages.

Bulla says he’d been approached by a number of firms about merger opportunities over the past 18 months, but nothing came of those conversations until PGAL came calling last October. At the time PGAL was going through a leadership transition in its Dallas office, which has been around since the early 1990s.

Pro Forma was on PGAL’s radar, says Bulla, because the two firms had competed for projects in several Texas markets, including PGAL’s home base in Houston. “They decided to look for a firm that already had an established reputation,” says Bulla.

He says he was attracted to PGAL’s culture and values, particularly its requirement that all of its principals be actively involved in projects. “I was impressed when I heard that the CEO had an office on the production floor.”

Bulla notes that PGAL’s operations are cloud-based, making collaboration among its offices around the country much easier and more likely. He also singles out PGAL’s generous employee-benefits package, and the company’s commitment to maintaining a stable workforce by shifting jobs among its offices depending on workload, as contributing factors to his decision to sell Pro Forma.

“Now, there’s no projects we can’t pursue,” says Bulla, who is especially eager to take advantage of corporate relocations to Texas. To bolster the Dallas office, he says “we’re looking for talent,” specifically “creative interns proficient in Revit.” He intends to add project architects and managers, and is looking longer term toward possibly adding an engineering principal to the office. 

 

 

Related Stories

| Nov 16, 2010

Architecture Billings Index: inquiries for new projects remain extremely high

The new projects inquiry index was 61.7, down slightly from a nearly three-year high mark of 62.3 in September, according to the Architecture Billings Index (ABI). However, the ABI dropped nearly two points in October; the October ABI score was 48.7, down from a reading of 50.4 the previous month. The ABI reflects the approximate nine to 12 month lag time between architecture billings and construction spending.

| Nov 16, 2010

Brazil Olympics spurring green construction

Brazil's green building industry will expand in the coming years, spurred by construction of low-impact venues being built for the 2016 Olympics. The International Olympic Committee requires arenas built for the 2016 games in Rio de Janeiro meet international standards for low-carbon emissions and energy efficiency. This has boosted local interest in developing real estate with lower environmental impact than existing buildings. The timing couldn’t be better: the Brazilian government is just beginning its long-term infrastructure expansion program.

| Nov 16, 2010

Green building market grows 50% in two years; Green Outlook 2011 report

The U.S. green building market is up 50% from 2008 to 2010—from $42 billion to $55 billion-$71 billion, according to McGraw-Hill Construction's Green Outlook 2011: Green Trends Driving Growth report. Today, a third of all new nonresidential construction is green; in five years, nonresidential green building activity is expected to triple, representing $120 billion to $145 billion in new construction.

| Nov 16, 2010

Calculating office building performance? Yep, there’s an app for that

123 Zero build is a free tool for calculating the performance of a market-ready carbon-neutral office building design. The app estimates the discounted payback for constructing a zero emissions office building in any U.S. location, including the investment needed for photovoltaics to offset annual carbon emissions, payback calculations, estimated first costs for a highly energy efficient building, photovoltaic costs, discount rates, and user-specified fuel escalation rates.

| Nov 16, 2010

CityCenter’s new Harmon Hotel targeted for demolition

MGM Resorts officials want to demolish the unopened 27-story Harmon Hotel—one of the main components of its brand new $8.5 billion CityCenter development in Las Vegas. In 2008, inspectors found structural work on the Harmon didn’t match building plans submitted to the county, with construction issues focused on improperly placed steel reinforcing bar. In January 2009, MGM scrapped the building’s 200 condo units on the upper floors and stopped the tower at 27 stories, focusing on the Harmon having just 400 hotel rooms. With the Lord Norman Foster-designed building mired in litigation, construction has since been halted on the interior, and the blue-glass tower is essentially a 27-story empty shell.

| Nov 16, 2010

Where can your firm beat the recession? Try any of these 10 places

Wondering where condos and rental apartments will be needed? Where companies are looking to rent office space? Where people will need hotel rooms, retail stores, and restaurants? Newsweek compiled a list of the 10 American cities best situated for economic recovery. The cities fall into three basic groups: Texas, the New Silicon Valleys, and the Heartland Honeys. Welcome to the recovery.

| Nov 16, 2010

Landscape architecture challenges Andrés Duany’s Congress for New Urbanism

Andrés Duany, founder of the Congress for the New Urbanism, adopted the ideas, vision,  and values of the early 20th Century landscape architects/planners John Nolen and Frederick Law Olmsted, Jr., to launch a movement that led to more than 300 new towns, regional plans, and community revitalization project commissions for his firm. However, now that there’s a societal buyer’s remorse about New Urbanism, Duany is coming up against a movement that sees landscape architecture—not architecture—as the design medium more capable of organizing the city and enhancing the urban experience.

| Nov 16, 2010

Just for fun: Words that architects use

If you regularly use such words as juxtaposition, folly, truncated, and articulation, you may be an architect. Architects tend to use words rarely uttered during normal conversations. In fact, 62% of all the words that come out of an architects mouth could be replaced by a simpler and more widely known word, according to this “report.” Review this list of designer words, and once you manage to work them into daily conversation, you’re on your way to becoming a bonafide architect.

| Nov 16, 2010

NFRC approves technical procedures for attachment product ratings

The NFRC Board of Directors has approved technical procedures for the development of U-factor, solar heat gain coefficient (SHGC), and visible transmittance (VT) ratings for co-planar interior and exterior attachment products. The new procedures, approved by unanimous voice vote last week at NFRC’s Fall Membership Meeting in San Francisco, will add co-planar attachments such as blinds and shades to the group’s existing portfolio of windows, doors, skylights, curtain walls, and window film.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021