Brooklyn-based photographer Benjamin Rosamund has created a thought-provoking time-lapse video of the construction of the One World Trade Center, the Daily Mail reports. Choosing from 30,000 photos that he took from the day construction began in 2006 to the day when construction was finished in 2012, Rosamund compressed 1,100 photos to create the two-minute video.
The One World Trade Center is a controversial piece of architecture—a symbol of recovery after the 9/11 terrorist attacks, the tower was also stalled by many years of arguing between victims' family members and authorities. The completed building is part memorial, part commercial center and part transportation hub.
The building has incorporated new security measures to protect it from an incident like the one that felled the first trade towers. The first 20 stories of the tower are windowless and made of concrete that can withstand the blast from a truck bomb. All glass is shatter-proof. And the stairs and elevator shafts have their own ventilation system—one staircase is has been reserved for emergency services only.
Related Stories
| Dec 16, 2011
Goody Clancy-designed Informatics Building dedicated at Northern Kentucky University
The sustainable building solution, built for approximately $255-sf, features innovative materials and intelligent building systems that align with the mission of integration and collaboration.
| Dec 16, 2011
Stalco Construction converts Babylon, N.Y. Town Hall into history museum
The project converted the landmark structure listed on the National Register of Historic Places into the Town of Babylon History Museum at Old Town Hall.
| Dec 14, 2011
Belfer Research Building tops out in New York
Hundreds of construction trades people celebrate reaching the top of concrete structure for facility that will accelerate treatments and cures at world-renowned institution.
| Dec 14, 2011
Tyler Junior College and Sika Sarnafil team up to save energy
Tyler Junior College wanted a roofing system that wouldn’t need any attention for a long time.
| Dec 13, 2011
Lutron’s Commercial Experience Center awarded LEED Gold
LEED certification of the Lutron facility was based on a number of green design and construction features that positively impact the project itself and the broader community. These features include: optimization of energy performance through the use of lighting power, lighting controls and HVAC, plus the use of daylight.
| Dec 12, 2011
AIA Chicago announces Skidmore, Owings & Merrill as 2011 Firm of the Year
SOM has been a leader in the research and development of specialized technologies, new processes and innovative ideas, many of which have had a palpable and lasting impact on the design profession and the physical environment.
| Dec 12, 2011
Skanska to expand and renovate hospital in Georgia for $103 Million
The expansion includes a four-story, 17,500 square meters clinical services building and a five-story, 15,700 square meters, medical office building. Skanska will also renovate the main hospital.
| Dec 12, 2011
CRSI design awards deadline extended to December 31
The final deadline is extended until December 31st, with judging shortly thereafter at the World of Concrete.