When it comes to physical size and aesthetics, the Statue of Liberty will soon have a West Coast counterpart.
Venus, a 92-foot stainless steel statue, will highlight a large public piazza in the middle of San Francisco’s Trinity Place.
Created by artist Lawrence Argent, Venus is a modern day interpretation of the Venus de Milo, the armless ancient Greek statue. Venus will be made of 2,500 stainless steel panels seamlessly welded together on site, and it will be unveiled this summer.
“The idea of replicating the Venus de Milo came from a classical idea – an icon – that has been revered and respected for centuries. Venus at Trinity Place became this whirling object manifesting like a genie in a bottle coming out of the ground,” Argent said in a statement.
For scale, Venus is a little shorter than New York’s Statue of Liberty, which stands 111.5 feet as measured from heel to crown.
Venus is part of a larger installation on the piazza at Trinity Place, named C’era Una Volta – “Once Upon a Time.” Other works include a 20-seat marble table, seven-foot glass bollards with sculptures inside, and a nine-foot marble dove.
The one-acre piazza will serve as an outdoor walkway between Market and Mission streets, right next to a 1,900-unit apartment complex.
Owned by San Francisco real estate developer Trinity Properties and opened in 2010, Trinity Place is comprised of four high-rise apartment buildings and 65,000 sf of planned retail space. The development is located in the city’s Mid-Market area, which houses tech giants like Uber, Twitter, and Square.
Related Stories
| Aug 11, 2010
Populous selected to design 'crystalline skin' stadium for 2014 Winter Olympics
Russian officials have selected global architect Populous to design the main stadium for the 2014 Winter Olympic and Paralympic Games in Sochi, Russia. The 40,000-seat stadium will feature a crystalline skin that "engages with its surroundings by day and provides an iconic representation of the color and spectacle of the games when illuminated at night," said Populous senior principal John Barrow.
| Aug 11, 2010
Skanska completes $74 million Harbor Towers project six months ahead of schedule
Skanska USA Building Inc. announced the completion of a $74 million rehabilitation project at Harbor Towers, a 40-story luxury condominium complex comprising two towers located on Boston’s waterfront. Skanska served as Program Manager and oversaw the repair and replacement work that dramatically enhanced the reliability, cost-effectiveness, and energy efficiency of the buildings’ MEP systems.
| Aug 11, 2010
ASHRAE research targets tying together BIM and energy efficiency
Ensuring that a common language of “energy efficiency” is spoken by both building information modeling software used by architects and energy analysis and simulation software used by engineers is the goal of new research funded by ASHRAE.
| Aug 11, 2010
M&A deal volume down 67% in engineering/construction sector: PricewaterhouseCoopers
Global Economic Uncertainty Results in Sluggish Deal Activity in U.S.; China Shows Significant Opportunity for Growth
| Aug 11, 2010
New Watt Stopper emergency relay panel
Watt Stopper/Legrand has developed a new relay panel to provide fail-safe emergency lighting in a variety of commercial settings. The Emergency Relay Panel option is UL924 listed for use on emergency circuits. It is available as an option with Watt Stopper’s 24 or 48 relay size Lighting Integrator (LI) low voltage lighting control panels.
| Aug 11, 2010
Three Opus Corporation companies file for bankruptcy
Opus Corporation, a developer headquartered in Minnetonka, Minn., filed for bankruptcy in three of its five regional operating companies: Opus East, Opus South, and Opus West. CEO Mark Rauenhorst said sharp declines in commercial real estate values and tight credit markets caused difficulties in refinancing assets and restructuring lending agreements.
| Aug 11, 2010
ZweigWhite names its fastest-growing architecture, engineering, and environmental firms
Management consulting and research firm ZweigWhite has identified the 200 fastest-growing architecture, engineering, and environmental consulting firms in the U.S. and Canada for its annual ranking, The Zweig Letter Hot Firm List. This annual list features the design and environmental firms that have outperformed the economy and competitors to become industry leaders.
| Aug 11, 2010
'Too cold' and 'too hot' most common complaints among office workers, says IFMA study
The International Facility Management Association has released “Temperature Wars: Savings vs. Comfort,” a new study that takes an in-depth look at the most common thermal complaints made by workers and the variety of ways facility professionals respond to them.For many years, IFMA has surveyed facility professionals to learn the top office complaints among employees.