flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Plan to demolish historic Riviera Hotel & Casino approved by Las Vegas tourism board

Hotel Facilities

Plan to demolish historic Riviera Hotel & Casino approved by Las Vegas tourism board

The project is the first step toward a $2.3 billion expansion of the Las Vegas Convention Center.


By John Caulfield, Senior Editor | August 19, 2015
Plan to demolish historic Riviera Hotel & Casino approved by Las Vegas tourism board

Photo: Alex Proimos/Wikimedia Commons

A contractor has told the Las Vegas Convention and Visitors Authority that demolishing the vacant Riviera Hotel & Casino and paving over that 26-acre site could cost up to $42 million.

Last February, the Authority purchased the Riviera for $182.5 million, plus $8.5 million in transaction costs. The Authority intends to use this space to expand the Las Vegas Convention Center out to the Las Vegas Strip, according to the Associated Press.

On August 11, the Authority’s board of directors unanimously approved a plan to demolish the Riviera and pave over the land rather than let the building sit vacant while the Authority finds the $2.3 billion needed to increase the size of the convention center to 5 million sf, from its current 3.1 million sf.

The contractor, Terry Miller of Cordell Corp., which is managing the Las Vegas Convention Center District project, told the board he expects the demolition would require an implosion as well as a teardown. However, the precise cost of that razing won’t be known until the Authority officially bids out the job.

The board had already rejected an alternative proposal that called for maintaining the vacant historic building—Las Vegas’s first high-rise resort when it opened on April 20, 1955—while demolition financing was sought. Miller estimated that option would have cost between $5 million and $10 million per year.

The 60-year-old Riviera, which closed on May 4, would be inventoried for hazardous materials before it is demolished.

Perhaps coincidentally, a week after the Authority’s board made its decision, Mandalay Bay Resort and Casino, at the far end of the Strip, opened a 350,000-sf expansion of its convention center that now exceeds 2 million total sf, and over 900,000 sf of contiguous exhibit space.

Rossi Ralenkotter, the Authority’s president and CEO, said that expanding the Las Vegas Convention Center is among the efforts needed to avoid lose ground to other destinations interested in peeling away some of Vegas’ convention business. “The fact is, there’s a destination arms race all around us,” he told AP.

Through June, Las Vegas’s visitor volume was up 1.5% over the same period last year to 21,008,251, according to the Authority’s estimates. But gaming revenue was flat at $4.824 billion. Gaming revenue from casinos on the Strip was off 1.4% to $3.16 billion of that total.

Nevada Gov. Brian Sandoval recently convened a new tourism committee, whose goals include examining Southern Nevada convention facilities and making recommendations about new space.

Related Stories

| Dec 10, 2013

Modular Pedia-Pod: Sustainability in healthcare construction [slideshow]

Greenbuild 2013 in Philadelphia was the site of a unique display—Pedia-Pod, a modular pediatric treatment room designed and built by NRB, in collaboration with the editors of Building Design+Construction, SGC Horizon LLC, and their team of medical design consultants.

| Dec 3, 2013

Creating a healthcare capital project plan: The truth behind the numbers

When setting up a capital project plan, it's one thing to have the data, but quite another to have the knowledge of the process. 

| Nov 27, 2013

Pediatric hospitals improve care with flexible, age-sensitive design

Pediatric hospitals face many of the same concerns as their adult counterparts. Inpatient bed demand is declining, outpatient visits are soaring, and there is a higher level of focus on prevention and reduced readmissions.

| Nov 27, 2013

Exclusive survey: Revenues increased at nearly half of AEC firms in 2013

Forty-six percent of the respondents to an exclusive BD+C survey of AEC professionals reported that revenues had increased this year compared to 2012, with another 24.2% saying cash flow had stayed the same.

| Nov 27, 2013

Wonder walls: 13 choices for the building envelope

BD+C editors present a roundup of the latest technologies and applications in exterior wall systems, from a tapered metal wall installation in Oklahoma to a textured precast concrete solution in North Carolina. 

| Nov 26, 2013

Construction costs rise for 22nd straight month in November

Construction costs in North America rose for the 22nd consecutive month in November as labor costs continued to increase, amid growing industry concern over the tight availability of skilled workers.

| Nov 25, 2013

Building Teams need to help owners avoid 'operational stray'

"Operational stray" occurs when a building’s MEP systems don’t work the way they should. Even the most well-designed and constructed building can stray from perfection—and that can cost the owner a ton in unnecessary utility costs. But help is on the way.

| Nov 19, 2013

Pediatric design in an adult hospital setting

Freestanding pediatric facilities have operational and physical characteristics that differ from those of adult facilities.

| Nov 19, 2013

Top 10 green building products for 2014

Assa Abloy's power-over-ethernet access-control locks and Schüco's retrofit façade system are among the products to make BuildingGreen Inc.'s annual Top-10 Green Building Products list. 

| Nov 18, 2013

6 checkpoints when designing a pediatric healthcare unit

As more time and money is devoted to neonatal and pediatric research, evidence-based design is playing an increasingly crucial role in the development of healthcare facilities for children. Here are six important factors AEC firms should consider when designing pediatric healthcare facilities.

boombox1
boombox2
native1

More In Category



3D Printing

3D-printed construction milestones take shape in Tennessee and Texas

Two notable 3D-printed projects mark milestones in the new construction technique of “printing” structures with specialized concrete. In Athens, Tennessee, Walmart hired Alquist 3D to build a 20-foot-high store expansion, one of the largest freestanding 3D-printed commercial concrete structures in the U.S. In Marfa, Texas, the world’s first 3D-printed hotel is under construction at an existing hotel and campground site.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021