For the first time since it was completed in 1933, Seattle’s Asian Art Museum is set to undergo a substantial renovation and expansion. LMN Architects announced the initial design for the renovation with the goal of ensuring the museum remains an important cultural resource moving forward.
Originally designed by the architectural partnership of Bebb and Gould, the museum’s expansion and renovation will take the Art Deco building and enable it to showcase more of its permanent collection while also providing more space to allow for additional special, temporary exhibitions.
A three-story expansion will provide new gallery space, education space, and administrative offices. A new terrace overlooking the east lawn has also been proposed and a glass park lobby addition will help improve circulation through the galleries and provide visual connections to the park.
In addition to the museum-specific updates, HVAC, fire safety, and seismic upgrades will also be made to the eight-decade-old building.
Funding for the project, whose budget currently sits at about $49 million, will be a mixture of public and private funds. And while fans of the museum sill surely be excited about the updates, the expansion and renovation does mean the museum will close at the end of February 2017 and not reopen until 2019.
Courtesy of LMN Architects
Courtesy of LMN Architects
Related Stories
| Apr 24, 2014
Unbuilt and Famous: LEGO releases box set of Bjarke Ingels' LEGO museum
LEGO Architecture has created a box set that customers can use to build replicas of the LEGO Museum, which is not yet built in real life. The museum, designed by the Bjarke Ingels Group, will commemorate the history of LEGO.
| Apr 18, 2014
Multi-level design elevates Bulgarian Children's Museum [slideshow]
Embodying the theme “little mountains,” the 35,000-sf museum will be located in a former college laboratory building in the Studenski-grad university precinct.
| Apr 16, 2014
Upgrading windows: repair, refurbish, or retrofit [AIA course]
Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.
| Apr 15, 2014
12 award-winning structural steel buildings
Zaha Hadid's Broad Art Museum and One World Trade Center are among the projects honored by the American Institute of Steel Construction for excellence in structural steel design.
| Apr 9, 2014
Colossal aquarium in China sets five Guinness World Records
With its seven salt and fresh water aquariums, totaling 12.87 million gallons, the Chimelong Ocean Kingdom theme park is considered the world’s largest aquarium.
| Apr 9, 2014
Steel decks: 11 tips for their proper use | BD+C
Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.
| Apr 2, 2014
8 tips for avoiding thermal bridges in window applications
Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.
| Mar 26, 2014
Callison launches sustainable design tool with 84 proven strategies
Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com.
Sponsored | | Mar 21, 2014
Kameleon Color paint creates color-changing, iridescent exterior for Exploration Tower at Port Canaveral
Linetec finishes Firestone’s UNA-CLAD panels, achieving a one-of-a-kind, dynamic appearance with the first use of Valspar’s new Kameleon Color
| Mar 20, 2014
Common EIFS failures, and how to prevent them
Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems.