flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Populous completes Phase II of renovations at Georgia Tech’s Mac Nease Baseball Park at Russ Chandler Stadium

Sports and Recreational Facilities

Populous completes Phase II of renovations at Georgia Tech’s Mac Nease Baseball Park at Russ Chandler Stadium

The project includes a new, year-round elite training facility.


By David Malone, Associate Editor | April 27, 2021
Georgia tech baseball stadium

All photos courtesy Georgia Tech.

Populous has completed the $10 million second phase renovation project for the Mac Nease Baseball Park at Russ Chandler Stadium at Georgia Tech.

Champions Hall, a two-story multi-purpose gathering space created on the expanded concourse, is a key component of the project. The space will celebrate the history of Georgia Tech Baseball, highlighting ACC Championships and trips to Omaha along with student-athlete accomplishments from years past. Champions Hall provides new premium chair back seating and a spacious event room that looks out onto the field. It will also serve as a meeting space for the baseball team and an event space for other organizations and alumni gatherings. The second floor also includes the Mark Teixeira Skyline Terrace, a premium seating area.

 

Georgia Tech batting lab

 

A new home plate club and two outdoor suites are located behind home plate and offer additional premium options for fans. New concessions and restrooms have been provided on the expanded left field plaza that also features new drink rail areas overlooking the field. Additionally, a new entry plaza will welcome fans and provide a space to socialize on gamedays.

 

Home Plate Club

 

The “jewel” of the Phase II renovation is the new climate-controlled elite training facility that can be used year-round by Georgia tech student-athletes, as well as alumni and professional baseball players during the offseason. The training facility includes a 2,000-sf pitching and hitting lab and 5,000-sf batting tunnel located under the concourse with connections to other team areas and direct access to the playing field. The pitching and hitting lab features motion capture cameras, tracking systems, and floor pressure plates that can record and analyze data for each player in real-time.

Related Stories

Arenas | Sep 20, 2021

LA Clippers unveil $1.8 billion Intuit Dome

AECOM is the lead designer for the project.

Sports and Recreational Facilities | Sep 15, 2021

Aston Martin breaks ground on new F1 headquarters

The project is located in Northamptonshire.

Giants 400 | Aug 30, 2021

2021 Giants 400 Report: Ranking the largest architecture, engineering, and construction firms in the U.S.

The 2021 Giants 400 Report includes more than 130 rankings across 25 building sectors and specialty categories.

Sports and Recreational Facilities | Aug 25, 2021

The rise of entertainment districts and the inside-out stadium

Fiserv Forum, home to the 2021 NBA Champion Milwaukee Bucks, proved that the design of the space outside a stadium is just as important as inside.

Resiliency | Aug 19, 2021

White paper outlines cost-effective flood protection approaches for building owners

A new white paper from Walter P Moore offers an in-depth review of the flood protection process and proven approaches.

Sports and Recreational Facilities | Aug 18, 2021

Populous’ design takes center stage for MLB’s Field of Dreams game

The movie-inspired ballpark is located in Dyersville, Iowa.

Sports and Recreational Facilities | Aug 5, 2021

Austin FC’s Q2 Stadium completes

Gensler designed the project.

Sports and Recreational Facilities | Jul 16, 2021

A new stadium in San Diego tops off

This will be part of a 135-acre campus innovation district.

Sports and Recreational Facilities | Jul 13, 2021

New York Liberty unveil new locker room renovation project at Barclays Center

A women-led team from Shawmut Design and Construction and Generator Studios conceptualized and completed the project.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021