flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Post Tower Wins CTBUH 10-Year Award

Post Tower Wins CTBUH 10-Year Award

Completed in 2002, the Post Tower blazed new trails by using technically integrated design to deliver high performance. 


By Council on Tall Buildings | July 28, 2014
Post Tower, a 163-meter office tower in Bonn, Germany, has received the 10 Year Award from the Council on Tall Buildings and Urban Habitat (CTBUH).
 
The 10 Year Award recognizes proven value and performance in a tall building, across one or more of a wide range of criteria, over a period of 10 years since its completion. This award gives an opportunity to reflect back on buildings that have been completed and operational for at least a decade, and acknowledge those projects which have performed successfully, long after the ribbon-cutting ceremonies have passed. 
 
Completed in 2002, the Post Tower blazed new trails by using technically integrated design to deliver high performance. Its two elliptical volumes, with an atrium between, work together with site and wind orientation, a double-skin, operable façade, and stack ventilation to remove much of the need for mechanical ventilation commonly found in large buildings. This not only allows the building to consume only 75 kilowatt-hours per square meter per year, which is 79 percent less energy than a typical office building of its size; it also makes for pleasant interior sky garden spaces and a more efficient floor plate. 
 
“The Post Tower was an early touchstone for sustainable tower design and has provided a very useful model through its attention to performance,” said Awards Jury Chair Jeanne Gang, founding principal, Studio Gang Architects. “The jury was impressed with the continued monitoring and proof of concept.”
 
“The Post Tower undoubtedly changes the way we look at sustainable building for the high rise typology,” said Awards juror David Gianotten, managing director, Office for Metropolitan Architecture (OMA). “The design single-handedly changed the way we look at façade and office design to date. It has become an exemplar sustainable icon in contemporary architecture.”
 
The other 10 Year Finalists considered for this Award were:
• Taipei 101, Taiwan, China
• Torre Agbar, Barcelona, Spain
• Uptown Munchen, Munich, Germany
• Highlight Towers, Munich, Germany 
• Time Warner Center, New York City, United States 
• Bloomberg Tower, New York City, United States 
• Tower Palace Three, Seoul, South Korea
 
All award winners, including the 2014 Best Tall Building Winners and Finalists, will be recognized at the CTBUH 13th Annual Awards Symposium, which will take place at the Illinois Institute of Technology, Chicago, on November 6. The symposium will be followed by the Awards Ceremony and Dinner in the iconic Crown Hall, designed by Mies van der Rohe. Click here to see the previously announced 2014 regional Best Tall Building award winners, here to see the 2014 Urban Habitat award winner and finalist, here to see the 2014 Tall Building Innovation Award winner and finalist, and here to see the 2014 Performance Award winner and finalist.
 
The CTBUH Awards are an independent review of new projects, judged by a panel of industry experts. Projects are recognized for making an extraordinary contribution to the advancement of tall buildings and the urban environment, and for achieving sustainability at the broadest level.
 
Winners and finalists are featured in the annual CTBUH Awards Book, which is published in conjunction with a major global publisher and distributed internationally each year.

Related Stories

| Jan 16, 2012

Suffolk completes construction on progressive operating suite

5,700 square-foot operating suite to be test bed for next generation of imaged-guided operating techniques.

| Jan 15, 2012

Hollister Construction Services oversees interior office fit-out for Harding Loevner

The work includes constructing open space areas, new conference, trading and training rooms, along with multiple kitchenettes. 

| Jan 15, 2012

Smith Consulting Architects designs Flower Hill Promenade expansion in Del Mar, Calif.

The $22 million expansion includes a 75,000-square-foot, two-story retail/office building and a 397-car parking structure, along with parking and circulation improvements and new landscaping throughout.

| Jan 15, 2012

535 Madison Avenue achieves LEED Gold certification

Class-A commercial building meets sustainability requirements of LEED Program.

| Jan 12, 2012

CSHQA receives AIA Northwest & Pacific Region Merit Award for Idaho State Capitol restoration

After a century of service, use, and countless modifications which eroded the historical character of the building and grounds, the restoration brought the 200,000-sf building back to its former grandeur by restoring historical elements, preserving existing materials, and rehabilitating spaces for contemporary uses.

| Jan 12, 2012

Stellar earns construction industry's most prestigious safety award

Now widely accepted as the construction industry's standard measure of safety performance, the STEP awards were established in 1989 to evaluate and improve safety practices and recognize outstanding safety efforts. 

| Jan 12, 2012

Building independence: New take on female power

Memoir explores historic engineering project, women's empowerment era.

| Jan 12, 2012

3M takes part in Better Buildings Challenge

As a partner in the challenge, 3M has committed to reduce energy use by 25% in 78 of its plants, encompassing nearly 38 million-sf of building space.

| Jan 11, 2012

DOE announces guide for 50% more energy efficient retail buildings

The 50% AEDG series provides a practical approach for designers and builders of retail stores, and other major commercial building types, to achieve 50% energy savings compared to the building energy code used in many parts of the nation. 

| Jan 11, 2012

Mortenson starts construction of Rim Rock Wind Project

Renewable energy contractor to build 189-megawatt wind project in Sunburst, Mont.

boombox1
boombox2
native1

More In Category


Urban Planning

Bridging the gap: How early architect involvement can revolutionize a city’s capital improvement plans

Capital Improvement Plans (CIPs) typically span three to five years and outline future city projects and their costs. While they set the stage, the design and construction of these projects often extend beyond the CIP window, leading to a disconnect between the initial budget and evolving project scope. This can result in financial shortfalls, forcing cities to cut back on critical project features.



Libraries

Reasons to reinvent the Midcentury academic library

DLR Group's Interior Design Leader Gretchen Holy, Assoc. IIDA, shares the idea that a designer's responsibility to embrace a library’s history, respect its past, and create an environment that will serve student populations for the next 100 years.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021