The Tower of Voices, part of the last major phase of work at the Flight 93 National Memorial located in Somerset County, Penn., where United Flight 93 crashed on Sept. 11, 2001, is conceived as both a musical instrument and a tower.
The 93-foot-tall precast tower comprises 40 custom-made aluminum wind chimes, with each chime producing a distinct musical note. Together, these chimes create a set of “40 voices” to memorialize the 40 passengers and crew who lost their lives when the flight was hijacked by terrorists. The chimes are suspended at variable heights, starting 20 feet above the main plaza and ascending to the top. The customizable features included in the precast concrete will enable the chimes to “sing” even at low wind speeds.
The tower form is designed as an enclosure that cradles the 40 chimes and opens towards the public plaza on which it stands. The precast concrete columns with branch connectors abstractly recall the Hemlock grove near the crash site. Precast concrete was used for the tower to accommodate the complex and unusual shapes of each component and because it had the strength needed to support the tall, slender frame.
The design process included a combination of consultants including a musician, chimes artist, acoustical engineer, and wind consultants. Diagonal column splices allowed the joints to blend in with diagonal beams. At the joints, pockets and splines aligned the column pairs vertically, creating symmetry in a structure with various angles, curves, and heights.
The project acts as a landmark memorial feature near the entrance of the park.
Related Stories
Concrete | May 18, 2021
GCP Applied Technologies Partners with Athena Sustainable Materials Institute
GCP Applied Technologies, a leading global provider of construction products technologies, is pleased to announce a partnership with Athena Sustainable Materials Institute, a nonprofit research collaborative bringing life cycle assessment to the construction sector.
Steel Buildings | Apr 17, 2021
Speed Core wall system is used for the second time in office building in San Jose
The construction method is expected to knock off three months from the project’s schedule.
Concrete | Apr 1, 2021
Fabcon acquires Michigan's Kerkstra Precast
Minneapolis-based Fabcon Precast, a leading provider of structural precast wall panels, announced today that, effective March 31st, it has acquired Kerkstra Precast, a Michigan corporation.
AEC Tech | Oct 28, 2020
Meet Jaibot, Hilti's new construction robot
The semi-autonomous robot is designed to assist MEP contractors with ceiling-drilling applications.
75 Top Building Products | Dec 16, 2019
Top Structural Products for 2019
Inpro’s Fireline 140 fire barrier and Owens Corning’s Foamglas cellular glass insulation are among the 10 structural products to make Building Design+Construction's 2019 101 Top Products report.
75 Top Building Products | Dec 16, 2019
101 Top Products for 2019
Building Design+Construction readers and editors select their top building products for the past 12 months in the fourth-annual 101 Top Products report.
Codes and Standards | Sep 9, 2019
Free app calculates maximum allowable heights and areas for buildings
A free app that calculates the maximum allowable heights and areas for buildings of various occupancy classifications and types of construction has been released.
Concrete | Jul 8, 2019
Concrete repair code requirements released
American Concrete Institute offers guidance on assessment, repair, rehab of existing concrete structures.
BD+C University Course | May 24, 2018
Accommodating movement in building envelope materials [AIA course]
We may think of the building envelope as an inanimate object, but in reality its components can be quite mobile. This AIA CES course is worth 1.0 AIA LU/HSW.